HomeMy WebLinkAboutIntermountain Gas 230906 Boise Construction IPUC Construction Inspection
Inspector(s): Galli Date(s): 09/06/2023
Company/Owner: Unit/OPID: 08160
Intermountain Gas Company (IGC
Address: 11445 & 11481 W Mesquite St City/District: Boise
Contractor/Job#: Foreman: Employees: See job list
425-117618 Jose Maceda
425-116733
Job Description: 114" Service Line install Circle: Distribution
Operator Supervisor: IGC FOC Jason One-Call Ticket: 340919 & 331140
On-Site: Y
Total Inspection Days: 1
Tasks: Rating Critical Procedure Comments
1. Materials—Handling, Storage, SAT OPS 11
Labeling
2. Trenching/Boring—Depth, Clearance SAT OPS 308
OPS 322
3. Bedding/Backfill SAT OPS 308
SF 418
4. Pipe Installation (Tracer Wire) SAT OPS 308
OPS 322
5. Valve Installation N/A OPS 703
6. Coating Condition N/A OPS 401
OPS 403
7. Manuals—Field Procedures, O & M SAT
8. Testing—Pressure, Duration, Type UNSAT OPS 505 See notes
9. OQ Qualifications SAT OPS 800
10. Casing Seal/Installation N/A OPS 325
11. Service Line Installation SAT OPS 302
12. Tie-In/Hot Tapping N/A OPS 600
13. Meter Location/Regulator Testing N/A OPS 302
14. Equipment Calibration Verification SAT OPS 501 Pyrometer exp 6/12/2024
15. EFV Installation SAT OPS 301 EFV 1200
16. MAOP N/A OPS 602
OPS 606
OPS 900
OPS 1000
17. Pure N/A OPS 603
18. Safety Equipment SAT SF 418
SF 422
19. Abandonment N/A OPS 607
20. Line Locating SAT OPS 611
1PUC Form 4 Rev. April 2023
IPUC Construction Inspection
21. Plastic Pipe SAT OPS 307
- Joiner(s) Qualified OPS 309
- Fusion Tools OPS 324
- Heat Plate OPS 325
- Joining Procedure OPS 800
22. Steel Pipe N/A OPS 200
- Welder(s) Qualified OPS 201
Pipe/Coating-Inspected/Repaired OPS 202
- Cathodic Protection OPS 306
-Non-Destructive Testing OPS 401
- Welding Procedures OPS 407
- Removal of asbestos wrap OPS 402
- Exothermic Welding OPS 403
4800
Additional Comments:
IPUC inspector Galli observed Das-Co a contractor for IGC install a 1/4" service line.
To address: 11445 W Mesquite St, Boise, ID
Observations included: trenching, line locating, thumper boring, tracer wire, butt fusion, stab fittings,
EFV 1200 installation, squeeze off,bedding and backfill. Quizzed employees on applicable AOCs for
fusion and squeeze off procedures. Inspector Galli witnessed a Das-Co employee completely fuse a
new service line to existing, in service, squeezed off pipe stub without conducting a pressure test in
accordance with OPS 505. FOC Jason arrived on-site, shut the job down for the and required the entire
Das-Co crew to redo their OQs.
To address: 11481 W Mesquite St, Boise, ID
Observations included: trenching, line locating, tracer wire and partial bedding.
Corrective Action Required: NOPV 1202307 Yes X No
Follow-up Required: By Date: Oc4.'�l -1013 Yes X No
Inspector(Lead):
Date: 09/06/2023
Galli —
Reviewer: 1
Date: 1 -7- d�3
Brooks