HomeMy WebLinkAboutIntermountain Gas 230823 Star Construction IPUC Construction Inspection
Inspector(s): Perkins Date(s): 23 August 2023
Company/Owner: Unit/OPID: 08160
Intermountain Gas Company IGC
Address: Cresta Del Sol#3 off Beacon Light Rd City/District: Star
Contractor/Job #: Foreman: Employees: See Line-up
367-0450 Cesar Medrano
Job Description: Install 2" main and 1/4" service Circle: Distribution
Operator Supervisor: One-Call Ticket: N/A
On-Site: N
Total Inspection Days: 1
Tasks: Rating Critical Procedure # Comments
1. Materials—Handling, Storage, SAT OPS 11
Labeling
2. Trenching/Boring—Depth, Clearance N/A OPS 308
OPS 322
3. Bedding/Backfill N/A OPS 308
SF 418
4. Pipe Installation(Tracer Wire) SAT OPS 308
OPS 322
5. Valve Installation N/A OPS 703
6. Coating Condition N/A OPS 401
OPS 403
7. Manuals—Field Procedures, O & M SAT
8. Testing—Pressure, Duration, Type N/A OPS 505
9. OQ Qualifications SAT OPS 800
10. Casing Seal/Installation N/A OPS 325
11. Service Line Installation SAT OPS 302 Stub off main
12. Tie-In/Hot Tapping N/A OPS 600
13. Meter Location/Regulator Testing N/A OPS 302
14. Equipment Calibration Verification SAT OPS 501 Pic of pyrometer in file,
all other equipment 31
Au 23 ex iration
15. EFV Installation N/A OPS 301
16. MAOP N/A OPS 602
OPS 606
OPS 900
OPS 1000
17. Pure N/A OPS 603
18. Safety Equipment SAT SF 418
SF 422
19. Abandonment N/A OPS 607
20. Line Locating N/A OPS 611
1PUC Form 4 Rev. April 2023
IPUC Construction Inspection
21. Plastic Pipe SAT OPS 307 Tied in 2"main in
- Joiner(s) Qualified OPS 309 subdivision with 2" tee
- Fusion Tools OPS 324 and 1/4" service stub.
- Heat Plate OPS 325
- Joining Procedure OPS 800
22. Steel Pipe N/A OPS 200
- Welder(s) Qualified OPS 201
Pipe/Coating—Inspected/Repaired OPS 202
- Cathodic Protection OPS 306
- Non-Destructive Testing OPS 401
- Welding Procedures OPS 407
- Removal of asbestos wrap OPS 402
- Exothermic Welding OPS 403
4800
Additional Comments:
IPUC inspector Perkins met with Crown Utilities a contractor for IGC at Cresta Del Sol #3 off Beacon
Light Rd in Star, Idaho. Observations included: Tracer wire, fusing, stab fitting, and stringing pipe.
Quizzed personnel on AOC's for saddle tee install and cooling time after a fuse. All procedures were
followed in accordance with IGCs Operations and Maintenance Manual, Federal Code, and Idaho Dig
Line Laws.
Corrective Action Required: Yes No X
Follow-up Required: By Date: Yes No X
Inspector (Lead): Date:
Perkins 8/23/2023
Reviewer:
Date: g-�_y- C�3
Brooks
IPUC Form 4 Rev. April 2023