Loading...
HomeMy WebLinkAboutIntermountain Gas 230816-17 Nampa Construction IPUC Construction Inspection Inspector(s): Perkins (1.5) Galli (1.0) Date(s): 8/16-17/2023 Company/Owner: Unit/OPID: 08160 Intermountain Gas Company (IGC Address: Franklin Rd/Star Rd City/District: Nampa Contractor/Job #: Foreman: Employees: See job list 371-3185/23NG-1027/ Donald Teel 277750 Job Description: Install a 4" 60 PSI main Circle: Distribution & high-pressure extension and 4" high-pressure extension Operator Supervisor: IGC FOC Joe Delatore One-Call Ticket: 2023262200/2023281039 On-Site: Y Total Inspection Days: 2.5 Tasks: Rating Critical Procedure # Comments 1. Materials—Handling, Storage, SAT OPS 11 Labeling 2. Trenching/Boring—Depth, Clearance SAT OPS 308 OPS 322 3. Bedding/Backfill SAT OPS 308 SF 418 4. Pipe Installation (Tracer Wire) SAT OPS 308 OPS 322 5. Valve Installation SAT OPS 703 6. Coating Condition SAT OPS 401 OPS 403 7. Manuals—Field Procedures, O & M SAT 8. Testing—Pressure, Duration, Type SAT OPS 505 9. OQ Qualifications SAT OPS 800 10. Casing Seal/Installation N/A OPS 325 11. Service Line Installation SAT OPS 302 12. Tie-In/Hot Tapping SAT OPS 600 13. Meter Location/Regulator Testing N/A OPS 302 14. Equipment Calibration Verification SAT OPS 501 Dates in file 15. EFV Installation SAT OPS 301 16. MAOP N/A OPS 602 OPS 606 OPS 900 OPS 1000 17. Pure SAT OPS 603 18. Safety Equipment SAT SF 418 SF 422 19. Abandonment N/A OPS 607 20. Line Locating SAT OPS 611 1 P U C Form 4 Rev. April 2023 IPUC Construction Inspection 21. Plastic Pipe SAT OPS 307 - Joiner(s) Qualified OPS 309 - Fusion Tools OPS 324 - Heat Plate OPS 325 - Joining Procedure OPS 800 22. Steel Pipe SAT OPS 200 -Welder(s) Qualified OPS 201 Pipe/Coating—Inspected/Repaired OPS 202 - Cathodic Protection OPS 306 -Non-Destructive Testing OPS 401 -Welding Procedures OPS 407 - Removal of asbestos wrap OPS 402 - Exothermic Welding OPS 403 4800 Additional Comments: IPUC inspector Perkins observed Das-Co a contractor for IGC install 4" PE main and 4"high-pressure main extension and service lines to two houses at Franklin Rd & Star Rd in Nampa, Idaho. Observations included: Trenching, line locating, safety equipment, shore box install, pipe wrapping, pipe stringing,purging, tracer-wire, 750 PSI nitrogen pressure test and 200 PSI integrity pressure hold on steel line and 150 PSI air test on plastic line , welding on side pots, tapping and plugging, tie-in of steel and plastic mains and electro-fusing, Quizzed employees on AOC recognition for trenching per Idaho dig line law and shading/cover of pipelines. All procedures were observed in compliance with IGCs Operations and Maintenance Manual. Corrective Action Required: Yes No X Follow-up Required: By Date: Yes No X Inspector (Lead): Date: 08/17/2023 Perkins Reviewer: Date: Brooks �• 01� •� IPUC Form 4 Rev. April 2023