Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Intermountain Gas 230816 Star Construction
IPUC Construction Inspection Inspector(s): Galli Date(s): 08/16/2023 Company/Owner: Unit/OPID: 08160 Intermountain Gas Company (IGC Address: 12577, 12569 & 12561 W Goldcrest Dr City/District: Star Contractor/Job #: Foreman: Employees: See job list 367-009661, 367-006489, KC Osmus 367-006488 Job Description: 1/4" Service Line install Circle: Distribution Operator Supervisor: IGC FOC John One-Call Ticket: 320938, 320939 & 321955 On-Site: Y Total Inspection Days: 1 Tasks: Ratin2 Critical Procedure# Comments 1. Materials—Handling, Storage, SAT OPS 11 Labeling 2. Trenching/Boring—Depth, Clearance SAT OPS 308 OPS 322 3. Bedding/Backfill SAT OPS 308 SF 418 4. Pipe Installation (Tracer Wire) SAT OPS 308 OPS 322 5. Valve Installation N/A OPS 703 6. Coating Condition N/A OPS 401 OPS 403 7. Manuals—Field Procedures, O & M SAT 8. Testing—Pressure, Duration, Type SAT OPS 505 90 psi for 15 minutes 9. OQ Qualifications SAT OPS 800 10. Casing Seal/Installation N/A OPS 325 11. Service Line Installation SAT OPS 302 12. Tie-In/Hot Tapping N/A OPS 600 13. Meter Location/Regulator Testing N/A OPS 302 14. Equipment Calibration Verification SAT OPS 501 Pyrometer exp 6/9/24 15. EFV Installation SAT OPS 301 EFV 1200 16. MAOP N/A OPS 602 OPS 606 OPS 900 OPS 1000 17. Pure N/A OPS 603 18. Safety Equipment SAT SF 418 SF 422 19. Abandonment N/A I OPS 607 20. Line Locating SAT OPS 611 1PUC Form 4 Rev. April 2023 I PUC Construction Inspection 21. Plastic Pipe SAT OPS 307 - Joiner(s) Qualified OPS 309 - Fusion Tools OPS 324 - Heat Plate OPS 325 - Joining Procedure OPS 800 22. Steel Pipe N/A OPS 200 -Welder(s) Qualified OPS 201 Pipe/Coating—Inspected/Repaired OPS 202 - Cathodic Protection OPS 306 -Non-Destructive Testing OPS 401 -Welding Procedures OPS 407 - Removal of asbestos wrap OPS 402 - Exothermic Welding OPS 403 4800 Additional Comments: IPUC inspector Galli observed Das-Co a contractor for IGC install 3 3/4" service lines. To address: 12577, 12569 & 12561 W Goldcrest Dr, Star, ID. Observations included: trenching, line locating, tracer wire,butt fusion, stab fittings, EFV 1200 installation, squeeze off, successful pressure test at 90 psi for 15 minutes,bedding and backfill. Quizzed employees on applicable AOCs for fusion and squeeze off procedures. Foreman and contractor management were advised of a span of control concern verbally. Corrective Action Required: Yes No X Follow-up Required: By Date: Yes No X Inspector (lead): Date: 08/16/2023 Galli - — Reviewer: g_ Date: Brooks I P U C Form 4 Rev. April 2023