HomeMy WebLinkAboutIntermountain Gas 230807 Meridian Construction IPUC Construction Inspection
Inspector(s): Perkins Date(s): 8/7/2023
Company/Owner: Unit/OPID: 08160
Intermountain Gas Company (IGC
Address: 6367/6327 W Stavros Dr City/District: Meridian
Contractor/Job #: Foreman: Employees: See job list
047444-371 Mike Krebs
Job Description: Relocate Riser/Install Circle: Distribution
a 3/a" service
Operator Supervisor: IGC FOC Joe Delatore One-Call Ticket: 281532/302741
On-Site: Y
Total Inspection Days: 1
Tasks: Rating Critical Procedure # Comments
1. Materials—Handling, Storage, SAT OPS 11
Labeling
2. Trenching/Boring—Depth, Clearance SAT OPS 308
OPS 322
3. Bedding/Backfill SAT OPS 308
SF 418
4. Pipe Installation (Tracer Wire) SAT OPS 308
OPS 322
5. Valve Installation N/A OPS 703
6. Coating Condition N/A OPS 401
OPS 403
7. Manuals—Field Procedures, O & M SAT
8. Testing—Pressure, Duration, Type SAT OPS 505
9. OQ Qualifications SAT OPS 800
10. Casing Seal/Installation N/A OPS 325
11. Service Line Installation SAT OPS 302
12. Tie-In/Hot Tapping N/A OPS 600
13. Meter Location/Regulator Testing N/A OPS 302
14. Equipment Calibration Verification SAT OPS 501 Calibration date pies in
file
15. EFV Installation SAT OPS 301
16. MAOP N/A OPS 602
OPS 606
OPS 900
OPS 1000
17. Pure SAT OPS 603
18. Safety Equipment SAT SF 418
SF 422
19. Abandonment N/A OPS 607
20. Line Locating SAT OPS 611
1PUC Form 4 Rev. April 2023
IPUC Construction Inspection
21. Plastic Pipe SAT OPS 307
- Joiner(s) Qualified OPS 309
- Fusion Tools OPS 324
- Heat Plate OPS 325
- Joining Procedure OPS 800
22. Steel Pipe N/A OPS 200
- Welder(s) Qualified OPS 201
Pipe/Coating—Inspected/Repaired OPS 202
- Cathodic Protection OPS 306
-Non-Destructive Testing OPS 401
-Welding Procedures OPS 407
- Removal of asbestos wrap OPS 402
- Exothermic Welding OPS 403
4800
Additional Comments:
IPUC inspector Perkins observed Das-Co a contractor for IGC relocate a riser at 6367 W Stavros rd as
the builder had not installed the pipe-out upon initial install of riser. 6327 W Stavros Rd the contractor
installed a 3/4" service in Meridian, Idaho. Observations included: Safety equipment, trenching,backfillin
tracer-wire, line-locating, fusing, stab fittings, tracer-wire, pressure testing and purging. Quizzed
employees on AOC recognition for rest times on pipe after fusing. All procedures were observed in
compliance with IGCs Operations and Maintenance Manual.
Corrective Action Required: Yes No X
Follow-up Required: By D Yes No X
Inspector (Lead): �' Date: 08/7/2023
Perkins �—
Reviewer:
Date: V-8-a3
Brooks
IPUC Form 4 Rev. April 2023