HomeMy WebLinkAboutIntermountain Gas 230802 Kuna Construction IPUC Construction Inspection Inspector(s): Galli, Brooks Date(s): 08/02/2023 Company/Owner: Unit/OPID: 08160 Intermountain Gas Company IGC Address: 102& 86 N Coltsfoot Ave City/District: Kuna Contractor/Job#: Foreman: Employees: See job list 11014-375, 011932-375 Jose Maceda 009434-375 Job Description: 3/4" Service Line install Circle: Distribution Operator Supervisor: IGC FOC Joe Del Torre One-Call Ticket: 282423, 282424 & 271918 On-Site: N Total Inspection Days: 2 Tasks: Rating Critical Procedure# Comments 1. Materials—Handling, Storage, SAT OPS 11 Labeling 2. Trenching/Boring—Depth, Clearance SAT OPS 308 OPS 322 3. Bedding/Backfill SAT OPS 308 SF 418 4. Pipe Installation (Tracer Wire) SAT OPS 308 OPS 322 5. Valve Installation N/A OPS 703 6. Coating Condition N/A OPS 401 OPS 403 7. Manuals—Field Procedures, O & M SAT 8. Testing—Pressure, Duration, Type SAT OPS 505 90 psi for 15 minutes 9. OQ Qualifications SAT OPS 800 10. Casing Seal/Installation N/A OPS 325 11. Service Line Installation SAT OPS 302 12. Tie-In/Hot Tapping N/A OPS 600 13. Meter Location/Regulator Testing N/A OPS 302 14. Equipment Calibration Verification SAT OPS 501 Pyrometer exp 8/15/2023 15. EFV Installation SAT OPS 301 EFV 1200 16. MAOP N/A OPS 602 OPS 606 OPS 900 OPS 1000 17. Pure N/A OPS 603 18. Safety Equipment SAT SF 418 SF 422 19. Abandonment N/A OPS 607 20. Line Locating SAT OPS 611 IPUC Form 4 Rev. April 2023 IPUC Construction Inspection 21. Plastic Pipe UNSAT OPS 307 Squeeze off procedures - Joiner(s) Qualified OPS 309 not followed. See - Fusion Tools OPS 324 comments for detail. - Heat Plate OPS 325 - Joining Procedure OPS 800 22. Steel Pipe N/A OPS 200 - Welder(s) Qualified OPS 201 Pipe/Coating—Inspected/Repaired OPS 202 - Cathodic Protection OPS 306 -Non-Destructive Testing OPS 401 - Welding Procedures OPS 407 - Removal of asbestos wrap OPS 402 - Exothermic Welding OPS 403 4800 Additional Comments: IPUC inspectors Galli and Brooks observed Das-Co a contractor for IGC install 3/4" service lines to 102 & 86 N Coltsfoot Ave and 209 N Cranesbill Ave in Kuna ID. Observations included: trenching, line locating, tracer wire,butt fusion, stab fittings, EFV 1200 installation, squeeze off, successful pressure test at 90 psi for 15 minutes,bedding and backfill. Inspector Galli observed the 3/4" stub squeezed off without the burlap cloth. Foreman Maceda was advised and FOC Del Torre was advised. NOPV 1202305 written. Corrective Action Required: NOPV 1202305 Yes X No Follow-up Required: By Date: Per NOPV 1202305 Yes X No Inspector (Lead): Date: 08/02/2023 Galli Reviewer: Date: 08/08/2023 Brooks IPUC Form 4 Rev. April 2023