Loading...
HomeMy WebLinkAboutIntermountain Gas 230731 Middleton Construction I PUC Construction Inspection Inspector(s): Galli,Brooks Date(s): 07/31/2023 Company/Owner: Unit/OPID: 08160 Intermountain Gas Company IGC Address: Middleton Rd and Bass Lane City/District: Middleton Contractor/Job #: Foreman: Employees: See job list 317-1857 Ken Sharpe Job Description: Install 4" PE main with 2" Circle: Distribution Service risers Operator Supervisor: IGC FOC Kyle Russo One-Call Ticket: 2023302591 07/29/2023 On-Site: N Total Inspection Days: 2 Tasks: Rating Critical Procedure # Comments 1. Materials—Handling, Storage, SAT OPS 11 Labeling 2. Trenching/Boring—Depth, Clearance SAT OPS 308 OPS 322 3. Bedding/Backfill SAT OPS 308 Watched partial bedding SF 418 4. Pipe Installation (Tracer Wire) SAT OPS 308 OPS 322 5. Valve Installation N/A OPS 703 6. Coating Condition N/A OPS 401 OPS 403 7. Manuals—Field Procedures, O & M SAT 8. Testing—Pressure, Duration, Type N/A OPS 505 9. OQ Qualifications SAT OPS 800 10. Casing Seal/Installation N/A OPS 325 11. Service Line Installation N/A OPS 302 12. Tie-In/Hot Tapping N/A OPS 600 13. Meter Location/Regulator Testing N/A OPS 302 14. Equipment Calibration Verification SAT OPS 501 Pyrometer exp 06/28/23 See notes 15. EFV Installation N/A OPS 301 16. MAOP N/A OPS 602 OPS 606 OPS 900 OPS 1000 17. Pure N/A OPS 603 18. Safety Equipment SAT SF 418 SF 422 19. Abandonment N/A OPS 607 20. Line Locating N/A OPS 611 1PUC Form 4 Rev. April 2023 IPUC Construction Inspection 21. Plastic Pipe SAT OPS 307 - Joiner(s) Qualified OPS 309 - Fusion Tools OPS 324 - Heat Plate OPS 325 - Joining Procedure OPS 800 22. Steel Pipe N/A OPS 200 - Welder(s) Qualified OPS 201 Pipe/Coating—Inspected/Repaired OPS 202 - Cathodic Protection OPS 306 -Non-Destructive Testing OPS 401 - Welding Procedures OPS 407 - Removal of asbestos wrap OPS 402 - Exothermic Welding OPS 403 4800 Additional Comments: IPUC inspectors Galli and Brooks observed a Probst crew a contractor for IGC install 4" PE main lines with 2" service stubs for 4 new industrial buildings in Middleton, ID. Observations included: safety equipment, correct trench depth, tracer wire install, partial bedding, butt fusion on 4" PE, 4" T's and 4" to 2" reducers, quizzed contractors on applicable AOCs for butt fusion. Pyrometer was expired on 06/28/2023 per the calibration sticker. However, IGC procedures OPS 501 (MDUG Instrument Calibration Requirements List) allow a grace period of 1 year not to exceed 15 months between calibrations. Corrective Action Required: Yes No X Follow-up Required: By Date: Yes No X Inspector (Lead): Date: 07/31/2023 Galli Reviewer: — Date: 07/31/2023 Brooks IPUC Form 4 Rev. April 2023