Loading...
HomeMy WebLinkAboutIntermountain Gas 230725-26 Meridian Construction IPUC Construction Inspection Inspector(s): Perkins Date(s): 7/25-26/2023 Company/Owner: Unit/OPID: 08160 Intermountain Gas Company (IGC Address: 3087 W Milano Dr City/District: Meridian Contractor/Job #: Foreman: Employees: See job list 23NG-3277 Walker Ray Job Description: Install a 1/4" service Circle: Distribution Operator Supervisor: IGC FOC John Hezeltine One-Call Ticket: 284881 On-Site: N Total Inspection Days: 2 Tasks: Rating Critical Procedure# Comments 1. Materials—Handling, Storage, SAT OPS 11 Labeling 2. Trenching/Boring—Depth, Clearance SAT OPS 308 OPS 322 3. Bedding/Backfill SAT OPS 308 SF 418 4. Pipe Installation (Tracer Wire) SAT OPS 308 OPS 322 5. Valve Installation N/A OPS 703 6. Coating Condition N/A OPS 401 OPS 403 7. Manuals—Field Procedures, O & M SAT 8. Testing—Pressure, Duration, Type SAT OPS 505 9. OQ Qualifications SAT OPS 800 10. Casing Seal/Installation N/A OPS 325 11. Service Line Installation SAT OPS 302 12. Tie-In/Hot Tapping N/A OPS 600 13. Meter Location/Regulator Testing N/A OPS 302 14. Equipment Calibration Verification SAT OPS 501 Calibration date pics in file 15. EFV Installation SAT OPS 301 16. MAOP N/A OPS 602 OPS 606 OPS 900 OPS 1000 17. Pure SAT OPS 603 18. Safety Equipment SAT SF 418 SF 422 19. Abandonment N/A OPS 607 20. Line Locating SAT OPS 611 1PUC Form 4 Rev. April 2023 IPUC Construction Inspection 21. Plastic Pipe SAT OPS 307 - Joiner(s) Qualified OPS 309 - Fusion Tools OPS 324 - Heat Plate OPS 325 - Joining Procedure OPS 800 22. Steel Pipe N/A OPS 200 - Welder(s) Qualified OPS 201 Pipe/Coating—Inspected/Repaired OPS 202 - Cathodic Protection OPS 306 -Non-Destructive Testing OPS 401 - Welding Procedures OPS 407 - Removal of asbestos wrap OPS 402 - Exothermic Welding OPS 403 4800 Additional Comments: IPUC inspector Perkins observed Das-Co a contractor for IGC install a 3/4" service off a 4" main to 3087 W Milano Dr, Meridian Idaho. Observations included: Safety equipment, trenching,backfilling, tracer-wire, line-locating, boring, 4" bolt on tee, fusing and shore box, Quizzed employees on AOC recognition for bolt on tee. All procedures were observed in compliance with IGCs Operations and Maintenance Manual. Corrective Action Required: Yes No X Follow-up Required: By Date: Yes No X Inspector(Lead): Perkins '�a� Date: JL/ 23 Reviewer: Date: Brooks IPUC Form 4 Rev. April 2023