HomeMy WebLinkAboutIntermountain Gas 230705 Boise Construction IPUC Construction Inspection Inspector(s): Perkins, Galli Date(s): 07/05/2023 Company/Owner: Unit/OPID: 08160 Intermountain Gas Company IGC Address: N 36th St and W Catalpa Dr City/District: Boise Contractor/Job#: Foreman: Employees: See job list 425-9925 Ethan Call Job Description: Install 2" PE main Circle: Distribution Operator Supervisor: IGC FOC Russo One-Call Ticket: 253999 6/28/23 On-Site: Y Total Inspection Days: 2 Tasks: RatinR Critical Procedure # Comments 1. Materials—Handling, Storage, SAT OPS 11 Labeling 2. Trenching/Boring—Depth, Clearance SAT OPS 308 OPS 322 3. Bedding/Backfill N/A OPS 308 SF 418 4. Pipe Installation(Tracer Wire) N/A OPS 308 OPS 322 5. Valve Installation N/A OPS 703 6. Coating Condition N/A OPS 401 OPS 403 7. Manuals—Field Procedures, O & M SAT 8. Testing—Pressure, Duration, Type N/A OPS 505 9. OQ Qualifications SAT OPS 800 10. Casing Seal/Installation N/A OPS 325 11. Service Line Installation N/A OPS 302 12. Tie-In/Hot Tapping N/A OPS 600 13. Meter Location/Regulator Testing N/A OPS 302 14. Equipment Calibration Verification N/A OPS 501 15. EFV Installation N/A j OPS 301 16. MAOP N/A OPS 602 OPS 606 OPS 900 OPS 1000 17. Pure N/A OPS 603 18. Safety Equipment SAT SF 418 SF 422 19. Abandonment N/A I OPS 607 20. Line Locating SAT I OPS 611 1 P U C Form 4 Rev. April 2023 IPUC Construction Inspection 21. Plastic Pipe N/A OPS 307 - Joiner(s) Qualified OPS 309 - Fusion Tools OPS 324 - Heat Plate OPS 325 - Joining Procedure OPS 800 22. Steel Pipe N/A OPS 200 - Welder(s) Qualified OPS 201 Pipe/Coating—Inspected/Repaired OPS 202 - Cathodic Protection OPS 306 - Non-Destructive Testing OPS 401 - Welding Procedures OPS 407 - Removal of asbestos wrap OPS 402 - Exothermic Welding OPS 403 4800 Additional Comments: IPUC inspectors Perkins and Galli observed Das-Co a contractor for IGC line locating, trenching, potholing, and boring. All IGC procedures were followed. Corrective Action Required: Yes No X Follow-up Required: By Date: Yes No X Inspector(Lead): Date: 7/6/2023 Perkins Reviewer: Date: Brooks IPUC Form 4 Rev. April 2023