HomeMy WebLinkAboutIntermountain Gas 230628 Filer Construction IPUC Construction Inspection
Inspector(s): Perkins, Brooks Date(s): 6/28/2023
Company/Owner: Unit/OPID: 08160
Intermountain Gas Company IGC
Address: 823/833 Fair Ave City/District: Filer
Contractor/Job #: Foreman: Employees: See list of personnel in file
581-0046 Dustin Carney
Job Description: Abandon 1/2" service line Circle: Distribution
Operator Supervisor: One-Call Ticket: 2023251198
On-Site: N
Total Inspection Days: 1
Tasks: Rating Critical Procedure # Comments
1. Materials—Handling, Storage, SAT OPS 11
Labeling
2. Trenching/Boring—Depth, Clearance SAT OPS 308
OPS 322
3. Bedding/Backfill SAT OPS 308
SF 418
4. Pipe Installation (Tracer Wire) SAT OPS 308
OPS 322
5. Valve Installation N/A OPS 703
6. Coating Condition SAT OPS 401
OPS 403
7. Manuals—Field Procedures, O & M SAT
8. Testing—Pressure, Duration, Type N.A OPS 505
9. OQ Qualifications SAT OPS 800
10. Casing Seal/Installation N/A OPS 325
11. Service Line Installation N/A OPS 302
12. Tie-In/Hot Tapping N/A OPS 600
13. Meter Location/Regulator Testing N/A OPS 302
14. Equipment Calibration Verification N/A OPS 501
15. EFV Installation N/A OPS 301
16. MAOP N/A OPS 602
OPS 606
OPS 900
OPS 1000
17. Pure SAT OPS 603
18. Safety Equipment SAT SF 418
SF 422
19. Abandonment SAT OPS 607
20. Line Locating SAT OPS 611
1PUC Form 4 Rev. April 2023
IPUC Construction Inspection
21. Plastic Pipe SAT OPS 307
- Joiner(s) Qualified OPS 309
- Fusion Tools OPS 324
- Heat Plate OPS 325
- Joining Procedure OPS 800
22. Steel Pipe N/A OPS 200
- Welder(s) Qualified OPS 201
Pipe/Coating—Inspected/Repaired OPS 202
- Cathodic Protection OPS 306
- Non-Destructive Testing OPS 401
- Welding Procedures OPS 407
- Removal of asbestos wrap OPS 402
- Exothermic Welding OPS 403
4800
Additional Comments:
IPUC inspectors Perkins and Brooks observed an IGC crew line locating, dig up two 1/2" service lines,
purge the line, cut the 11/2" service lines and put cap&go on, reattach the tracer wire for future install,
foam fill the abandoned line on both ends and backfill the excavation. All procedures were observed in
compliance with IGCs Operations and Maintenance Manual.
Corrective Action Required: Yes No X
Follow-up Required: By D e: ., Yes No X
Inspector (Lead): �'• ,. Date: 06/28/2023
Perkins I
Reviewer: Date: N�r ^ r1
Brooks II d-
IPUC Form 4 Rev. April 2023