Loading...
HomeMy WebLinkAboutIntermountain Gas 230627 Ketchum Construction I PUC Construction Inspection Inspector(s): Perkins, Brooks Date(s): 6/27/2023 Company/Owner: Unit/OPID: 08160 Intermountain Gas Company IGC Address: 10 Sun Tree Ln City/District: Ketchum Contractor/Job #: Foreman: Employees: See list of personnel in file 517-0018 Dustin Carney Job Description: Abandon 1/4" service line Circle: Distribution Operator Supervisor: IGC FOC Raff One-Call Ticket: 2023252999 On-Site: Y Total Inspection Days: 1 Tasks: Rating Critical Procedure# Comments 1. Materials—Handling, Storage, SAT OPS 11 Labeling 2. Trenching/Boring—Depth, Clearance SAT OPS 308 OPS 322 3. Bedding/Backfill SAT OPS 308 SF 418 4. Pipe Installation (Tracer Wire) SAT OPS 308 OPS 322 5. Valve Installation N/A OPS 703 6. Coating Condition SAT OPS 401 OPS 403 7. Manuals—Field Procedures, O & M SAT 8. Testing—Pressure, Duration, Type SAT OPS 505 9. OQ Qualifications SAT OPS 800 10. Casing Seal/Installation N/A OPS 325 11. Service Line Installation N/A OPS 302 12. Tie-In/Hot Tapping N/A OPS 600 13. Meter Location/Regulator Testing N/A OPS 302 14. Equipment Calibration Verification SAT OPS 501 15. EFV Installation N/A OPS 301 16. MAOP N/A OPS 602 OPS 606 OPS 900 OPS 1000 17. Pure SAT OPS 603 18. Safety Equipment SAT SF 418 SF 422 19. Abandonment SAT I I OPS 607 20. Line Locating SAT I I OPS 611 1PUC Form 4 Rev. April 2023 IPUC Construction Inspection 21. Plastic Pipe N/A OPS 307 - Joiner(s) Qualified OPS 309 - Fusion Tools OPS 324 - Heat Plate OPS 325 - Joining Procedure OPS 800 22. Steel Pipe SAT OPS 200 - Welder(s) Qualified OPS 201 Pipe/Coating—Inspected/Repaired OPS 202 - Cathodic Protection OPS 306 -Non-Destructive Testing OPS 401 - Welding Procedures OPS 407 - Removal of asbestos wrap OPS 402 - Exothermic Welding OPS 403 4800 Additional Comments: IPUC inspectors Perkins and Brooks observed an IGC crew line locating, dig up a 2" main and 1/4" service line, pin the tapping tee, purge the line, cut the 1/4" service line, weld on a metal/PE transition fitting and reattach the tracer wire for future install, weld the abandoned 1/4" line shut on both ends and backfill the excavation with sand and native soil. All procedures were observed in compliance with IGCs Operations and Maintenance Manual. Corrective Action Required: Yes No X Follow-up Required: By Date: Yes No X Inspector (Lead): .�^ Date: 06/27/2023 Perkins r Reviewer: ,; Date: Brooks IPUC Form 4 Rev.April 2023