HomeMy WebLinkAboutIntermountain Gas 230627 Ketchum Construction I PUC Construction Inspection
Inspector(s): Perkins, Brooks Date(s): 6/27/2023
Company/Owner: Unit/OPID: 08160
Intermountain Gas Company IGC
Address: 10 Sun Tree Ln City/District: Ketchum
Contractor/Job #: Foreman: Employees: See list of personnel in file
517-0018 Dustin Carney
Job Description: Abandon 1/4" service line Circle: Distribution
Operator Supervisor: IGC FOC Raff One-Call Ticket: 2023252999
On-Site: Y
Total Inspection Days: 1
Tasks: Rating Critical Procedure# Comments
1. Materials—Handling, Storage, SAT OPS 11
Labeling
2. Trenching/Boring—Depth, Clearance SAT OPS 308
OPS 322
3. Bedding/Backfill SAT OPS 308
SF 418
4. Pipe Installation (Tracer Wire) SAT OPS 308
OPS 322
5. Valve Installation N/A OPS 703
6. Coating Condition SAT OPS 401
OPS 403
7. Manuals—Field Procedures, O & M SAT
8. Testing—Pressure, Duration, Type SAT OPS 505
9. OQ Qualifications SAT OPS 800
10. Casing Seal/Installation N/A OPS 325
11. Service Line Installation N/A OPS 302
12. Tie-In/Hot Tapping N/A OPS 600
13. Meter Location/Regulator Testing N/A OPS 302
14. Equipment Calibration Verification SAT OPS 501
15. EFV Installation N/A OPS 301
16. MAOP N/A OPS 602
OPS 606
OPS 900
OPS 1000
17. Pure SAT OPS 603
18. Safety Equipment SAT SF 418
SF 422
19. Abandonment SAT I I OPS 607
20. Line Locating SAT I I OPS 611
1PUC Form 4 Rev. April 2023
IPUC Construction Inspection
21. Plastic Pipe N/A OPS 307
- Joiner(s) Qualified OPS 309
- Fusion Tools OPS 324
- Heat Plate OPS 325
- Joining Procedure OPS 800
22. Steel Pipe SAT OPS 200
- Welder(s) Qualified OPS 201
Pipe/Coating—Inspected/Repaired OPS 202
- Cathodic Protection OPS 306
-Non-Destructive Testing OPS 401
- Welding Procedures OPS 407
- Removal of asbestos wrap OPS 402
- Exothermic Welding OPS 403
4800
Additional Comments:
IPUC inspectors Perkins and Brooks observed an IGC crew line locating, dig up a 2" main and 1/4"
service line, pin the tapping tee, purge the line, cut the 1/4" service line, weld on a metal/PE transition
fitting and reattach the tracer wire for future install, weld the abandoned 1/4" line shut on both ends and
backfill the excavation with sand and native soil. All procedures were observed in compliance with
IGCs Operations and Maintenance Manual.
Corrective Action Required: Yes No X
Follow-up Required: By Date: Yes No X
Inspector (Lead):
.�^ Date: 06/27/2023
Perkins
r
Reviewer: ,;
Date:
Brooks
IPUC Form 4 Rev.April 2023