Inspector(s): Perkins, Gall,, -I?Z66 �--s Date(s): 6/20-22/2023; 08/01/2023
Company/Owner: Unit/OPID: 08160
Intermountain Gas Company IGC)
Address: Cole Road/Desert/Latigo City/District: Boise
Contractor/Job #: Foreman: Employees: See job list
Main W/O 297025 Christopher Dixon
Service W/O 297026 Darcy U alde
Job Description: Aldyl-A replacement, 2" PE Circle: Distribution
Install, %" PE services
Operator Supervisor: QCI Inspectors One-Call Ticket: 243597&2023243911
On-Site: Y
Total Inspection Days: 7
Tasks: Rating Critical Procedure# Comments
1. Materials—Handling, Storage, SAT OPS 11
Labeling
2. Trenching/Boring—Depth, Clearance SAT OPS 308
OPS 322
3. Bedding/Backfill SAT OPS 308
SF 418
4. Pipe Installation (Tracer Wire) SAT OPS 308
OPS 322
5. Valve Installation N/A OPS 703
6. Coating Condition N/A OPS 401
OPS 403
7. Manuals—Field Procedures, O & M SAT
8. Testing—Pressure, Duration, Type SAT OPS 505
9. OQ Qualifications SAT OPS 800
10. Casing Seal/Installation N/A OPS 325
11. Service Line Installation SAT OPS 302
12. Tie-In/Hot Tapping SAT OPS 600
13. Meter Location/Regulator Testing N/A OPS 302
14. Equipment Calibration Verification SAT OPS 501 See in file
15. EFV Installation SAT OPS 301
16. MAOP N/A OPS 602
OPS 606
OPS 900
OPS 1000
17. Pure SAT OPS 603
18. Safety Equipment SAT SF 418
SF 422
19. Abandonment SAT OPS 607
20. Line Locating SAT OPS 611
IPUC Form 4 Rev. April 2023
IPUC Construction Inspection
21. Plastic Pipe SAT OPS 307
- Joiner(s) Qualified OPS 309
- Fusion Tools OPS 324
- Heat Plate OPS 325
- Joining Procedure OPS 800
22. Steel Pipe N/A OPS 200
- Welder(s) Qualified OPS 201
Pipe/Coating—Inspected/Repaired OPS 202
- Cathodic Protection OPS 306
-Non-Destructive Testing OPS 401
- Welding Procedures OPS 407
- Removal of asbestos wrap OPS 402
- Exothermic Welding OPS 403
4800
Additional Comments:
June 20-21, 2023 (4 days): IPUC inspectors Perkins and Galli observed Das-Co a contractor for IGC
doing an Aldyl-A replacement project and reinstalling 2" PE main, 1/4" service line, new risers, meter
bars and meters near Cole Road/Desert/Latigo intersections. Observations included: trenching,boring,
backfilling,bedding, safety equipment, calibrated fusion tools, fusions on 2" & 3/4"PE, main and
service line install, tracer wire, pressure testing, line locating. There was a service line strike at 5977
Latigo, all emergency personnel responded, Das-Co contractor made the repair under the supervision of
IGC personnel. Quizzed employees on AOC recognition for fusing. All procedures were observed in
compliance with IGCs Operations and Maintenance Manual.
June 22, 2023 (1 day): IPUC inspectory Perkins observed Das-Co a contractor for IGC doing an Aldyl-
A replacement project and reinstalling 2" PE main, 1/4" service line, new risers, meter bars and meters
near Cole Road/Desert/Latigo intersections.
August 1, 2023 (2 Days): IPUC inspectors Brooks and Galli observed a DASCO crew install a 3/4"
service line at 5676 S Latigo Dr in Boise ID. Observations included: trenching, line locating, tracer
wire, EFV 1200 installation,butt fusion, electro fusion,bedding and backfill. Dasco crews were
quizzed on applicable AOCs for butt fusion. Additionally, a second Dasco bore crew was observed
boring and installing a temporary sleeve at 5634 S Latigo Dr in Boise, ID. All procedures were followed
in accordance with IGC procedures.
Corrective Action Required: Yes No X
Follow-up Required: By Date: Yes No X
Inspector (Lead): Date: 10/23/2023
Perkins
Reviewer: Date: 10
Brooks
IPUC Form 4 Rev. April 2023