Loading...
HomeMy WebLinkAboutIntermountain Gas 230614 Caldwell Construction IPUC Construction Inspection Inspector(s): Perkins, Galli Date(s): 6/14/2023 Company/Owner: Unit/OPID: 08160 Intermountain Gas Company IGC Address: Ustick Road & Indiana Ave City/District: Caldwell Contractor/Job #: Foreman: Employees: See job list 23NG-1019 /298781 Phillip Potgieter Job Description: Install a 4" main Circle: Distribution Operator Supervisor: IGC FOC Kyle One-Call Ticket: 2023234026 On-Site: Y Total Inspection Days: 2 Tasks: Rating Critical Procedure # Comments 1. Materials—Handling, Storage, SAT OPS 11 Labeling 2. Trenching/Boring—Depth, Clearance SAT OPS 308 OPS 322 3. Bedding/Backfill N/A OPS 308 SF 418 4. Pipe Installation (Tracer Wire) N/A OPS 308 OPS 322 5. Valve Installation N/A OPS 703 6. Coating Condition N/A OPS 401 OPS 403 7. Manuals—Field Procedures, O & M SAT 8. Testing—Pressure, Duration, Type N/A OPS 505 9. OQ Qualifications SAT OPS 800 10. Casing Seal/Installation N/A OPS 325 11. Service Line Installation N/A OPS 302 12. Tie-In/Hot Tapping N/A OPS 600 13. Meter Location/Regulator Testing N/A OPS 302 14. Equipment Calibration Verification SAT OPS 501 Pyrometer exp 8/15/23 15. EFV Installation N/A OPS 301 16. MAOP N/A OPS 602 OPS 606 OPS 900 OPS 1000 17. Pure N/A OPS 603 18. Safety Equipment SAT SF 418 SF 422 19. Abandonment N/A OPS 607 20. Line Locating N/A OPS 611 1PUC Form 4 Rev. April 2023 IPUC Construction Inspection 21. Plastic Pipe SAT OPS 307 - Joiner(s) Qualified OPS 309 - Fusion Tools OPS 324 - Heat Plate OPS 325 - Joining Procedure OPS 800 22. Steel Pipe N/A OPS 200 - Welder(s) Qualified OPS 201 Pipe/Coating—Inspected/Repaired OPS 202 - Cathodic Protection OPS 306 -Non-Destructive Testing OPS 401 -Welding Procedures OPS 407 - Removal of asbestos wrap OPS 402 - Exothermic Welding OPS 403 4800 Additional Comments: IPUC inspectors Perkins and Galli observed Das-Co a contractor for IGC install a section of 4" PE main at Ustick Road and Indiana Ave. Observations included: trenching, safety equipment, calibrated fusion tools, fusions on 4" PE. Quizzed employees on AOC recognition for fusing. All procedures were observed in compliance with IGCs Operations and Maintenance Manual. Corrective Action Required: Yes No X Follow-up Required: By D e: Yes No X Inspector (Lead): Date: 06/14/2023 Perkins Reviewer: Date: Brooks IPUC Form 4 Rev. April 2023