HomeMy WebLinkAboutIntermountain Gas 230613 Boise Construction IPUC Construction Inspection
Inspector(s): Perkins, Galli Date(s): 6/13/2023
Company/Owner: Unit/OPID: 08160
Intermountain Gas Company IGC
Address: Right of way between Hwy 21 and City/District: Boise
E Columbia Rd
Contractor/Job #: Foreman: Employees: See job list
22NG-1026 Kobi Voyson
Job Description: Replacement of 2" PE to 4" PE Circle: Distribution
Operator Supervisor: IGC FOC Jason One-Call Ticket: 2023221783
On-Site: Y
Total Inspection Days: 2
Tasks: Rating Critical Procedure# Comments
1. Materials—Handling, Storage, SAT OPS 11
Labeling
2. Trenching/Boring—Depth, Clearance SAT OPS 308
OPS 322
3. Bedding/Backfill SAT OPS 308
SF 418
4. Pipe Installation (Tracer Wire) SAT OPS 308
OPS 322
5. Valve Installation N/A OPS 703
6. Coating Condition N/A OPS 401
OPS 403
7. Manuals—Field Procedures, O & M SAT
8. Testing—Pressure, Duration, Type N/A OPS 505
9. OQ Qualifications SAT OPS 800
10. Casing Seal/Installation N/A OPS 325
11. Service Line Installation N/A OPS 302
12. Tie-In/Hot Tapping N/A OPS 600
13. Meter Location/Regulator Testing N/A OPS 302
14. Equipment Calibration Verification SAT OPS 501 Pyrometer exp 4/5/24
15. EFV Installation N/A OPS 301
16. MAOP N/A OPS 602
OPS 606
OPS 900
OPS 1000
17. Pure N/A OPS 603
18. Safety Equipment SAT SF 418
SF 422
19. Abandomnent N/A I OPS 607
20. Line Locating SAT I OPS 611
IPUC Form 4 Rev. April 2023
IPUC Construction Inspection
21. Plastic Pipe SAT OPS 307
- Joiner(s) Qualified OPS 309
- Fusion Tools OPS 324
- Heat Plate OPS 325
- Joining Procedure OPS 800
22. Steel Pipe N/A OPS 200
- Welder(s) Qualified OPS 201
Pipe/Coating—Inspected/Repaired OPS 202
- Cathodic Protection OPS 306
-Non-Destructive Testing OPS 401
- Welding Procedures OPS 407
- Removal of asbestos wrap OPS 402
- Exothermic Welding OPS 403
4800
Additional Comments:
IPUC inspectors Perkins and Galli observed Das-Co a contractor for IGC replace a section of 2" PE
main with 4" PE main between Hwy 21 and E Columbia Rd in Boise, ID that will be tied into regulator
station 40038. Observations included: trenching, line locating, tracer wire install, safety equipment,
calibrated fusion tool verification, butt fusions on 4" PE, bedding and backfill with sand. Quizzed
employees on AOC recognition for fusing. All procedures were observed in compliance with IGCs
Operations and Maintenance Manual.
Corrective Action Required: Yes No X
Follow-up Required: By Date: Yes No X
Inspector (Lead): Date: 06/13/2023
Perkins
Reviewer: Date: $•(5'�3
Brooks
IPUC Form 4 Rev. April 2023