Loading...
HomeMy WebLinkAboutIntermountain Gas 230524 Kuna Construction IPUC Construction Inspection Inspector(s): Perkins Date(s): 24 May 2023 Company/Owner: Unit/OPID: 08160 Intermountain Gas Company IGC Address: 1388 W Morganite St City/District: Kuna Contractor/Job #: Foreman: Employees: See Line-up 375-10621 Dominic Greco Job Description: Install 1/4" service line Circle: Distribution Operator Supervisor: One-Call Ticket: 201222 On-Site: N Total Inspection Days: 1 Tasks: Rating Critical Procedure# Comments 1. Materials—Handling, Storage, SAT OPS 11 Labeling 2. Trenching/Boring—Depth, Clearance SAT OPS 308 OPS 322 3. Bedding/Backfill SAT OPS 308 SF 418 4. Pipe Installation(Tracer Wire) SAT OPS 308 OPS 322 5. Valve Installation N/A OPS 703 6. Coating Condition N/A OPS 401 OPS 403 7. Manuals—Field Procedures, O & M SAT 8. Testing—Pressure, Duration, Type N/A OPS 505 9. OQ Qualifications SAT OPS 800 10. Casing Seal/Installation N/A OPS 325 11. Service Line Installation SAT OPS 302 12. Tie-In/Hot Tapping N/A OPS 600 13. Meter Location/Regulator Testing N/A OPS 302 14. Equipment Calibration Verification SAT OPS 501 Pies in file 15. EFV Installation N/A OPS 301 16. MAOP N/A OPS 602 OPS 606 OPS 900 OPS 1000 17. Pure N/A OPS 603 18. Safety Equipment SAT SF 418 SF 422 19. Abandonment N/A OPS 607 20. Line Locating SAT OPS 611 IPUC Form 4 Rev. April 2023 IPUC Construction Inspection 21. Plastic Pipe SAT OPS 307 Had a lot of trouble with - Joiner(s) Qualified OPS 309 the cradle, supv brought - Fusion Tools OPS 324 out new cradle and crew - Heat Plate OPS 325 completed project. - Joining Procedure OPS 800 22. Steel Pipe N/A OPS 200 - Welder(s) Qualified OPS 201 Pipe/Coating—Inspected/Repaired OPS 202 - Cathodic Protection OPS 306 -Non-Destructive Testing OPS 401 - Welding Procedures OPS 407 - Removal of asbestos wrap OPS 402 - Exothermic Welding OPS 403 4800 Additional Comments: IPUC inspector Perkins met with Das-Co a contractor for IGC at 1388 W Morganite St, Kuna Idaho. Observations included: trenching, line locating, tracer wire, riser install, fusing, and bedding/backfilling. All procedures were followed in accordance with IGCs Operations and Maintenance Manual, Federal Code, and Idaho Dig Line Laws. Corrective Action Required: Yes No X Follow-up Required: By Date: Yes No X Inspector (Lead): 24 May Perkins .: Date: 2023 Reviewer: Date: Brooks IPUC Form 4 Rev. April 2023