HomeMy WebLinkAboutIntermountain Gas 230524 Kuna Construction IPUC Construction Inspection
Inspector(s): Perkins Date(s): 24 May 2023
Company/Owner: Unit/OPID: 08160
Intermountain Gas Company IGC
Address: 1388 W Morganite St City/District: Kuna
Contractor/Job #: Foreman: Employees: See Line-up
375-10621 Dominic Greco
Job Description: Install 1/4" service line Circle: Distribution
Operator Supervisor: One-Call Ticket: 201222
On-Site: N
Total Inspection Days: 1
Tasks: Rating Critical Procedure# Comments
1. Materials—Handling, Storage, SAT OPS 11
Labeling
2. Trenching/Boring—Depth, Clearance SAT OPS 308
OPS 322
3. Bedding/Backfill SAT OPS 308
SF 418
4. Pipe Installation(Tracer Wire) SAT OPS 308
OPS 322
5. Valve Installation N/A OPS 703
6. Coating Condition N/A OPS 401
OPS 403
7. Manuals—Field Procedures, O & M SAT
8. Testing—Pressure, Duration, Type N/A OPS 505
9. OQ Qualifications SAT OPS 800
10. Casing Seal/Installation N/A OPS 325
11. Service Line Installation SAT OPS 302
12. Tie-In/Hot Tapping N/A OPS 600
13. Meter Location/Regulator Testing N/A OPS 302
14. Equipment Calibration Verification SAT OPS 501 Pies in file
15. EFV Installation N/A OPS 301
16. MAOP N/A OPS 602
OPS 606
OPS 900
OPS 1000
17. Pure N/A OPS 603
18. Safety Equipment SAT SF 418
SF 422
19. Abandonment N/A OPS 607
20. Line Locating SAT OPS 611
IPUC Form 4 Rev. April 2023
IPUC Construction Inspection
21. Plastic Pipe SAT OPS 307 Had a lot of trouble with
- Joiner(s) Qualified OPS 309 the cradle, supv brought
- Fusion Tools OPS 324 out new cradle and crew
- Heat Plate OPS 325 completed project.
- Joining Procedure OPS 800
22. Steel Pipe N/A OPS 200
- Welder(s) Qualified OPS 201
Pipe/Coating—Inspected/Repaired OPS 202
- Cathodic Protection OPS 306
-Non-Destructive Testing OPS 401
- Welding Procedures OPS 407
- Removal of asbestos wrap OPS 402
- Exothermic Welding OPS 403
4800
Additional Comments:
IPUC inspector Perkins met with Das-Co a contractor for IGC at 1388 W Morganite St, Kuna Idaho.
Observations included: trenching, line locating, tracer wire, riser install, fusing, and bedding/backfilling.
All procedures were followed in accordance with IGCs Operations and Maintenance Manual, Federal
Code, and Idaho Dig Line Laws.
Corrective Action Required: Yes No X
Follow-up Required: By Date: Yes No X
Inspector (Lead): 24 May
Perkins .: Date: 2023
Reviewer:
Date:
Brooks