HomeMy WebLinkAboutIntermountain Gas 230523 Star Construction IPUC Construction Inspection
Inspector(s): Perkins Date(s): 23 May 2023
Company/Owner: Unit/OPID: 08160
Intermountain Gas Company (IGC
Address: 3301 N Pollard In City/District: Star
Contractor/Job#: Foreman: Employees: See Line-up
367-0417 Ethan Call
Job Description: Install 3/4" service lines Circle: Distribution
Operator Supervisor: One-Call Ticket: 2023192845
On-Site: Y Kyle Russo
Total Inspection Days: 1
Tasks: Rating Critical Procedure # Comments
1. Materials—Handling, Storage, SAT OPS 11
Labeling
2. Trenching/Boring—Depth, Clearance SAT OPS 308 140ft bore
OPS 322
3. Bedding/Backfill SAT OPS 308
SF 418
4. Pipe Installation (Tracer Wire) SAT OPS 308
OPS 322
5. Valve Installation N/A OPS 703
6. Coating Condition N/A OPS 401
OPS 403
7. Manuals—Field Procedures, O & M SAT
8. Testing—Pressure, Duration, Type N/A OPS 505
9. OQ Qualifications SAT OPS 800
10. Casing Seal/Installation N/A OPS 325
11. Service Line Installation SAT OPS 302
12. Tie-In/Hot Tapping N/A OPS 600
13. Meter Location/Regulator Testing N/A OPS 302
14. Equipment Calibration Verification SAT OPS 501 Pics in file
15. EFV Installation SAT OPS 301
16. MAOP N/A OPS 602
OPS 606
OPS 900
OPS 1000
17. Pure N/A OPS 603
18. Safety Equipment SAT SF 418
SF 422
19. Abandonment N/A OPS 607
20. Line Locating SAT OPS 611
1 P U C Forth 4 Rev. April 2023
IPUC Construction Inspection
21. Plastic Pipe SAT OPS 307
- Joiner(s) Qualified OPS 309
- Fusion Tools OPS 324
- Heat Plate OPS 325
- Joining Procedure OPS 800
22. Steel Pipe N/A OPS 200
- Welder(s) Qualified OPS 201
Pipe/Coating—Inspected/Repaired OPS 202
- Cathodic Protection OPS 306
-Non-Destructive Testing OPS 401
- Welding Procedures OPS 407
- Removal of asbestos wrap OPS 402
- Exothermic Welding OPS 403
4800
Additional Comments:
IPUC inspector Perkins met with Das-Co a contractor for IGC at 3301 N Pollard In, Star Idaho.
Observations included: trenching,boring, repair of sprinkler lines, line locating, tracer wire, fusing, and
bedding/backfilling. All procedures were followed in accordance with IGCs Operations and
Maintenance Manual, Federal Code, and Idaho Dig Line Laws.
Corrective Action Required: Yes No X
Follow-up Required: By Date: Yes No X
Inspector (Lead): Date: 23 May
Perkins 2023
Reviewer:
Date:
Brooks
IPUC Form 4 Rev. April 2023