HomeMy WebLinkAboutIntermountain Gas 230516 Meridian Construction IPUC Construction Inspection
Inspector(s): Brooks Date(s): 16 May 2023
Company/Owner: Unit/OPID: 08160
Intermountain Gas Company IGC
Address: 4970 N Brody Ave, 5152 N Brock Ave, City/District: Meridian
5168 N Brock Ave
Contractor/Job #: Foreman: Employees: See Line-up
413-1874, 413-1786 Darcy Ugalde
Job Description: Install 1/4" service lines Circle: Distribution
Operator Supervisor: One-Call Ticket: 181945, 191268
On-Site: Y
Total Inspection Days: 1
Tasks: Rating Critical Procedure# Comments
1. Materials—Handling, Storage, SAT OPS 11
Labeling
2. Trenching/Boring—Depth, Clearance SAT OPS 308
OPS 322
3. Bedding/Backfill SAT OPS 308
SF 418
4. Pipe Installation (Tracer Wire) SAT OPS 308
OPS 322
5. Valve Installation N/A OPS 703
6. Coating Condition N/A OPS 401
OPS 403
7. Manuals—Field Procedures, O & M SAT
8. Testing—Pressure, Duration, Type SAT OPS 505 93 PSI-15 Min
9. OQ Qualifications SAT OPS 800
10. Casing Seal/Installation N/A OPS 325
11. Service Line Installation SAT OPS 302
12. Tie-In/Hot Tapping N/A OPS 600
13. Meter Location/Regulator Testing SAT OPS 302
14. Equipment Calibration Verification SAT OPS 501 Pyrometer Due 12-1-23
Gauge Due 8-15-23
15. EFV Installation SAT OPS 301
16. MAOP N/A OPS 602
OPS 606
OPS 900
OPS 1000
17. Pure SAT OPS 603
18. Safety Equipment SAT SF 418
SF 422
19. Abandonment N/A I OPS 607
20. Line Locating SAT I OPS 611
1PUC Form 4 Rev. April 2023
IPUC Construction Inspection
21. Plastic Pipe SAT OPS 307
- Joiner(s) Qualified OPS 309
- Fusion Tools OPS 324
- Heat Plate OPS 325
- Joining Procedure OPS 800
22. Steel Pipe N/A OPS 200
-Welder(s) Qualified OPS 201
Pipe/Coating—Inspected/Repaired OPS 202
- Cathodic Protection OPS 306
-Non-Destructive Testing OPS 401
- Welding Procedures OPS 407
- Removal of asbestos wrap OPS 402
- Exothermic Welding OPS 403
4800
Additional Comments:
IPUC inspector Brooks met with Das-Co, a contractor for IGC at 4970 N Brody Ave, 5152 N Brock
Ave, and 5168 N Brock Ave in Meridian, Idaho. Observations included: trenching, line locating, tracer
wire, fusing, stab fittings, purging, pressure testing, gas quality testing, and bedding/backfilling. All
procedures were followed in accordance with IGCs Operations and Maintenance Manual, Federal Code,
and Idaho Dig Line Laws.
Corrective Action Required: Yes No k
Follow-up Required: By Date: Yes No X
Inspector (Lead):
16 May
Date: 2023
Brooks
Reviewer: W
Date:
IPUC Form 4 Rev. April 2023