HomeMy WebLinkAboutIntermountain Gas 230515 Eagle Construction IPUC Construction Inspection
Inspector(s): Perkins Date(s): 15 May 2023
Company/Owner: Unit/OPID: 08160
Intermountain Gas Company (IGC
Address: 5635 W Polecat Dr City/District: Eagle
Contractor/Job #: Foreman: Employees: See Line-up
417-16056 Juan Soto
Job Description: Install 1/4" service line Circle: Distribution
Operator Supervisor: One-Call Ticket: 191324
On-Site: N
Total Inspection Days: 1
Tasks: Rating Critical Procedure # Comments
1. Materials—Handling, Storage, SAT OPS 11
Labeling
2. Trenching/Boring—Depth, Clearance SAT OPS 308
OPS 322
3. Bedding/Backfill SAT OPS 308
SF 418
4. Pipe Installation(Tracer Wire) SAT OPS 308
OPS 322
5. Valve Installation N/A OPS 703
6. Coating Condition N/A OPS 401
OPS 403
7. Manuals—Field Procedures, O & M SAT
8. Testing—Pressure, Duration, Type SAT OPS 505 90 PSI-15 Min
9. OQ Qualifications SAT OPS 800
10. Casing Seal/Installation N/A OPS 325
11. Service Line Installation SAT OPS 302
12. Tie-In/Hot Tapping SAT OPS 600
13. Meter Location/Regulator Testing N/A OPS 302
14. Equipment Calibration Verification SAT OPS 501 Pics in file
15. EFV Installation SAT OPS 301
16. MAOP N/A OPS 602
OPS 606
OPS 900
OPS 1000
17. Pure SAT OPS 603
18. Safety Equipment SAT SF 418
SF 422
19. Abandonment N/A I OPS 607
20. Line Locating SAT I OPS 611
1PUC Form 4 Rev. April 2023
IPUC Construction Inspection
21. Plastic Pipe SAT OPS 307
- Joiner(s) Qualified OPS 309
- Fusion Tools OPS 324
- Heat Plate OPS 325
- Joining Procedure OPS 800
22. Steel Pipe N/A OPS 200
-Welder(s) Qualified OPS 201
Pipe/Coating—Inspected/Repaired OPS 202
- Cathodic Protection OPS 306
-Non-Destructive Testing OPS 401
- Welding Procedures OPS 407
- Removal of asbestos wrap OPS 402
- Exothermic Welding OPS 403
4800
Additional Comments:
IPUC inspector Perkins met with Das-Co a contractor for IGC at 5635 W Polecat Drive, Eagle Idaho.
Observations included: trenching, line locating, tracer wire, fusing, stab fittings, purging, pressure
testing, gas quality testing, meter bar installation and bedding/backfilling. All procedures were
followed in accordance with IGCs Operations and Maintenance Manual, Federal Code, and Idaho Dig
Line Laws.
Corrective Action Required: Yes No
Follow-up Required: By Date: 4.2 Yes No ix
Inspector (Lead): ,; '` 15 May
Date:
Perkins /, 2023
Reviewer:
Date:
IPUC Form 4 Rev. April 2023