HomeMy WebLinkAboutIntermountain Gas 230515 Boise Construction IPUC Construction Inspection
Inspector(s): Brooks Date(s): 15 May 2023
Company/Owner: Unit/OPID: 08160
Intermountain Gas Company (IGC
Address: 5156 N Becker Ridge Lane and City/District: Boise
13360 N Hazel Grouse Place
Contractor/Job #: Foreman: Employees: Bruno Valenzuela, Hayden Nilsson
425-111886, 425-117370 Rigo Chavarin
Job Description: Install'/4" service lines Circle: Distribution
Operator Supervisor: One-Call Ticket: 171223, 192049
On-Site: Y (Jason)
Total Inspection Days: 1
Tasks: Rating Critical Procedure# Comments
1. Materials—Handling, Storage, SAT OPS 11
Labeling
2. Trenching/Boring—Depth, Clearance SAT OPS 308
OPS 322
3. Bedding/Backfill SAT OPS 308
SF 418
4. Pipe Installation (Tracer Wire) SAT OPS 308
OPS 322
5. Valve Installation N/A OPS 703
6. Coating Condition N/A OPS 401
OPS 403
7. Manuals—Field Procedures, O & M SAT
8. Testing—Pressure, Duration, Type SAT OPS 505 92 PSI-15 Min
9. OQ Qualifications SAT OPS 800
10. Casing Seal/Installation N/A OPS 325
11. Service Line Installation SAT OPS 302
12. Tie-In/Hot Tapping N/A OPS 600
13. Meter Location/Regulator Testing SAT OPS 302
14. Equipment Calibration Verification SAT OPS 501 Pyrometer—Due 1-6-24
Gauge—Due 12-8-23
15. EFV Installation SAT OPS 301
16. MAOP N/A OPS 602
OPS 606
OPS 900
OPS 1000
17. Pure N/A OPS 603
18. Safety Equipment SAT SF 418
SF 422
19. Abandonment N/A I OPS 607
20. Line Locating SAT I OPS 611
1PUC Form 4 Rev. April 2023
IPUC Construction Inspection
21. Plastic Pipe SAT OPS 307
- Joiner(s) Qualified OPS 309
- Fusion Tools OPS 324
- Heat Plate OPS 325
- Joining Procedure OPS 800
22. Steel Pipe N/A OPS 200
-Welder(s) Qualified OPS 201
Pipe/Coating—Inspected/Repaired OPS 202
- Cathodic Protection OPS 306
-Non-Destructive Testing OPS 401
- Welding Procedures OPS 407
- Removal of asbestos wrap OPS 402
- Exothermic Welding OPS 403
4800
Additional Comments:
IPUC inspector Brooks met with Das-Co, a contractor for IGC at 5156 N Becker Ridge Lane and
13360 N Hazel Grouse Place, Boise Idaho. Observations included: trenching, line locating, tracer wire,
fusing, pressure testing, bedding/backfilling, and efv installation. All procedures were followed in
accordance with IGCs Operations and Maintenance Manual, Federal Code, and Idaho Dig Line Laws.
Corrective Action Required: Yes No x
Follow-up Required: By Date: Yes No x
Inspector (Lead): Date:
J. Brooks 5/15/23
Reviewer:
Date:
IPUC Form 4 Rev. April 2023