Loading...
HomeMy WebLinkAboutIntermountain Gas 230515 Boise Construction IPUC Construction Inspection Inspector(s): Brooks Date(s): 15 May 2023 Company/Owner: Unit/OPID: 08160 Intermountain Gas Company (IGC Address: 5156 N Becker Ridge Lane and City/District: Boise 13360 N Hazel Grouse Place Contractor/Job #: Foreman: Employees: Bruno Valenzuela, Hayden Nilsson 425-111886, 425-117370 Rigo Chavarin Job Description: Install'/4" service lines Circle: Distribution Operator Supervisor: One-Call Ticket: 171223, 192049 On-Site: Y (Jason) Total Inspection Days: 1 Tasks: Rating Critical Procedure# Comments 1. Materials—Handling, Storage, SAT OPS 11 Labeling 2. Trenching/Boring—Depth, Clearance SAT OPS 308 OPS 322 3. Bedding/Backfill SAT OPS 308 SF 418 4. Pipe Installation (Tracer Wire) SAT OPS 308 OPS 322 5. Valve Installation N/A OPS 703 6. Coating Condition N/A OPS 401 OPS 403 7. Manuals—Field Procedures, O & M SAT 8. Testing—Pressure, Duration, Type SAT OPS 505 92 PSI-15 Min 9. OQ Qualifications SAT OPS 800 10. Casing Seal/Installation N/A OPS 325 11. Service Line Installation SAT OPS 302 12. Tie-In/Hot Tapping N/A OPS 600 13. Meter Location/Regulator Testing SAT OPS 302 14. Equipment Calibration Verification SAT OPS 501 Pyrometer—Due 1-6-24 Gauge—Due 12-8-23 15. EFV Installation SAT OPS 301 16. MAOP N/A OPS 602 OPS 606 OPS 900 OPS 1000 17. Pure N/A OPS 603 18. Safety Equipment SAT SF 418 SF 422 19. Abandonment N/A I OPS 607 20. Line Locating SAT I OPS 611 1PUC Form 4 Rev. April 2023 IPUC Construction Inspection 21. Plastic Pipe SAT OPS 307 - Joiner(s) Qualified OPS 309 - Fusion Tools OPS 324 - Heat Plate OPS 325 - Joining Procedure OPS 800 22. Steel Pipe N/A OPS 200 -Welder(s) Qualified OPS 201 Pipe/Coating—Inspected/Repaired OPS 202 - Cathodic Protection OPS 306 -Non-Destructive Testing OPS 401 - Welding Procedures OPS 407 - Removal of asbestos wrap OPS 402 - Exothermic Welding OPS 403 4800 Additional Comments: IPUC inspector Brooks met with Das-Co, a contractor for IGC at 5156 N Becker Ridge Lane and 13360 N Hazel Grouse Place, Boise Idaho. Observations included: trenching, line locating, tracer wire, fusing, pressure testing, bedding/backfilling, and efv installation. All procedures were followed in accordance with IGCs Operations and Maintenance Manual, Federal Code, and Idaho Dig Line Laws. Corrective Action Required: Yes No x Follow-up Required: By Date: Yes No x Inspector (Lead): Date: J. Brooks 5/15/23 Reviewer: Date: IPUC Form 4 Rev. April 2023