Loading...
HomeMy WebLinkAboutIntermountain Gas 230510 Boise Construction I PU C Construction Inspection Inspector(s): Perkins Date(s): 10 May 2023 Company/Owner: Unit/OPID: 08160 Intermountain Gas Company IGC) Address: 827 Blue Rim Lane City/District: Boise Contractor/Job#: Foreman: Employees: See Line-up 23NG 3199 Chris Dixon Job Description: Install%'9 service line Circle: Distribution Operator Supervisor: One-Call Ticket: 173539 On-Site: N Total Inspection Days: 1 Tasks: Rating Critical Procedure# Comments 1. Materials—Handling, Storage, SAT OPS 11 Labeling 2. Trenching/Boring—Depth, Clearance SAT OPS 308 OPS 322 3. Bedding/Backfill SAT OPS 308 SF 418 4. Pipe Installation(Tracer Wire) SAT OPS 308 OPS 322 5. Valve Installation N/A OPS 703 6. Coating Condition N/A OPS 401 OPS 403 7. Manuals—Field Procedures, O &M SAT 8. Testing—Pressure, Duration, Type SAT OPS 505 95 PSI-15 Min 9. OQ Qualifications SAT OPS 800 10. Casing Seal/Installation N/A OPS 325 11. Service Line Installation SAT OPS 302 12. Tie-In/Hot Tapping SAT OPS 600 Bolt on saddle tee 13. Meter Location/Regulator Testing N/A OPS 302 14. Equipment Calibration Verification SAT OPS 501 Pics in file 15. EFV Installation SAT OPS 301 16. MAOP N/A OPS 602 OPS 606 OPS 900 OPS 1000 17. Pure N/A OPS 603 18. Safety Equipment SAT SF 418 SF 422 19. Abandonment N/A OPS 607 20. Line Locating SAT OPS 611 1PUC Form 4 Rev. April 2023 IPUC Construction Inspection 21. Plastic Pipe SAT OPS 307 - Joiner(s) Qualified OPS 309 - Fusion Tools OPS 324 - Heat Plate OPS 325 - Joining Procedure OPS 800 22. Steel Pipe N/A OPS 200 - Welder(s) Qualified OPS 201 Pipe/Coating—Inspected/Repaired OPS 202 - Cathodic Protection OPS 306 - Non-Destructive Testing OPS 401 - Welding Procedures OPS 407 - Removal of asbestos wrap OPS 402 - Exothermic Welding OPS 403 4800 Additional Comments: IPUC inspector Perkins met with Das-Co a contractor for IGC at 8227 Blue Rim Lane, Boise Idaho. Observations included: trenching, line locating, tracer wire, fusing, pressure testing, bedding/backfilling and tapping, . All procedures were followed in accordance with IGCs Operations and Maintenance Manual, Federal Code, and Idaho Dig Line Laws. Corrective Action Required: Yes No Follow-up Required: By Date: Yes No Inspector(Lead): Date: 10 May Perkins v2 2023 Reviewer: Date: a_3o5(5 0 8� IPUC Form 4 Rev.April 2023