Loading...
HomeMy WebLinkAboutIntermountain Gas 230503 08 09 Eagle Construction IPUC Construction Inspection Inspector(s): Perkins, Brooks Date(s): 3, 8, 9 May 2023 Company/Owner: Unit/OPID: 08160 Intermountain Gas Company (IGC Address: Eagle Rd & River Meadow City/District: Eagle Contractor/Job #: Foreman: Employees: See Lineup 23NG-1016 /293601 Kobi Voyson Job Description: 4" pipeline patrol relocates Circle: Distribution Operator Supervisor: One-Call Ticket: 2023172024 On-Site: Will Lindsey Total Inspection Days: 4.5 Tasks: Rating Critical Procedure# Comments 1. Materials—Handling, Storage, SAT OPS 11 Labeling 2. Trenching/Boring—Depth, Clearance N/A OPS 308 OPS 322 3. Bedding/Backfill SAT OPS 308 SF 418 4. Pipe Installation(Tracer Wire) N/A OPS 308 OPS 322 5. Valve Installation SAT OPS 703 6. Coating Condition SAT OPS 401 OPS 403 7. Manuals—Field Procedures, O & M SAT 8. Testing—Pressure, Duration, Type N/A OPS 505 9. OQ Qualifications SAT OPS 800 10. Casing Seal/Installation N/A OPS 325 11. Service Line Installation N/A OPS 302 12. Tie-In/Hot Tapping N/A OPS 600 13. Meter Location/Regulator Testing N/A OPS 302 14. Equipment Calibration Verification SAT OPS 501 Pies in file 15. EFV Installation N/A OPS 301 16. MAOP N/A OPS 602 OPS 606 OPS 900 OPS 1000 17. Pure SAT OPS 603 18. Safety Equipment SAT SF 418 SF 422 19. Abandonment N/A OPS 607 20. Line Locating SAT OPS 611 1PUC Form 4 Rev. April 2023 IPUC Construction Inspection 21. Plastic Pipe N/A OPS 307 - Joiner(s) Qualified OPS 309 - Fusion Tools OPS 324 - Heat Plate OPS 325 -Joining Procedure OPS 800 22. Steel Pipe SAT OPS 200 -Welder(s) Qualified OPS 201 Pipe/Coating—Inspected/Repaired OPS 202 - Cathodic Protection OPS 306 -Non-Destructive Testing OPS 401 - Welding Procedures OPS 407 - Removal of asbestos wrap OPS 402 - Exothermic Welding OPS 403 4800 Additional Comments: IPUC inspector Perkins and Brooks met with Das-Co a contractor for IGC at Eagle Road and River Meadow in, Eagle Idaho. Project consisted of relocating a 4" distribution main (patrol) out from underneath a bridge to the side of the bridge for ease of observation when doing patrol inspections. Welders/Crew constructed a loop on each end of the bridge for the project. Observations included taking measurements, cutting, welding, pre-heating, fitting, aligning fittings so seams do not touch,jeeping, surface prep, pipe wax wrap,backfilling and installing valve access sleeve, line locating, traffic control and excavation. IGC tapping/stopping crew did 2 taps and assisted with pipe fitting. Das-Co foreman was reminded to call other utilities when they are struck while excavating as required by Idaho Dig-Line Law. All procedures were followed in accordance with IGCs Operations and Maintenance Manual, Federal Code. Corrective Action Required: Yes No X Follow-up Required: By Date: Yes No X Inspector (Lead): Date: Perkins 9 May 2023 Reviewer: Date: 0 - Brooks IPUC Form 4 Rev. April 2023