Loading...
HomeMy WebLinkAboutIntermountain Gas 230419-20 Middleton Construction IPUC Construction Inspection Inspector(s): Perkins, Brooks, Galli Date(s): 4/19-20/2023 Company/Owner: Unit/OPID: 08160 Intermountain Gas Company IGC Address: Purple Sage Dr and Cemetery Rd City/District: Middleton Contractor/Job#: Foreman: Employees: See job list 23NG-1014 /294780 Philip Potgieter Job Description: 6" PE Main Extension Circle: Distribution Operator Supervisor: Kyle Russo One-Call Ticket: 2023150495 On-Site: No Total Inspection Days: 3 Tasks: Rating Critical Procedure# Comments 1. Materials—Handling, Storage, SAT OPS 11 Labeling 2. Trenching/Boring—Depth, Clearance SAT OPS 308 OPS 322 3. Bedding/Backfill SAT OPS 308 SF 418 4. Pipe Installation(Tracer Wire) SAT OPS 308 OPS 322 5. Valve Installation N/A OPS 703 6. Coating Condition N/A OPS 401 OPS 403 7. Manuals—Field Procedures, O & M SAT 8. Testing—Pressure, Duration, Type N/A OPS 505 9. OQ Qualifications SAT OPS 800 10. Casing Seal/Installation N/A OPS 325 11. Service Line Installation N/A OPS 302 12. Tie-In/Hot Tapping N/A OPS 600 13. Meter Location/Regulator Testing N/A OPS 302 14. Equipment Calibration Verification N/A OPS 501 15. EFV Installation N/A OPS 301 16. MAOP N/A OPS 602 OPS 606 OPS 900 OPS 1000 17. Pure N/A OPS 603 18. Safety Equipment SAT SF 418 SF 422 19. Abandonment N/A OPS 607 20. Line Locating SAT OPS 611 IPUC Form 4 Rev. April 2023 IPUC Construction Inspection 21. Plastic Pipe SAT OPS 307 - Joiner(s) Qualified OPS 309 - Fusion Tools OPS 324 - Heat Plate OPS 325 - Joining Procedure OPS 800 22. Steel Pipe N/A OPS 200 - Welder(s) Qualified OPS 201 Pipe/Coating—Inspected/Repaired OPS 202 - Cathodic Protection OPS 306 -Non-Destructive Testing OPS 401 - Welding Procedures OPS 407 - Removal of asbestos wrap OPS 402 - Exothermic Welding OPS 403 4800 Additional Comments: 4/19/2023 IPUC inspectors Perkins and Galli observed Das-Co a contractor for IGC install approximately 170 feet of 6-inch PE main along Purple Sage Drive in Middleton, ID. Observations included: trenching, tracer wire, line locating,boring and pull back, inspection of completed fusions, OQ verification and AOC recognition. All procedures were followed in accordance with IGCs Operations and Maintenance Manual. 4/20/2023 IPUC inspector Brooks and Galli observed Das-co trench, laid 6" PE main, installed tracer wire, install a Maloney post, electro fuse a 6" coupler and bedding. Corrective Action Required: Yes No Follow-up Required: By Date: Yes No Inspector(Lead): Date: Brooks 4/20/2023 Reviewer: Date: k 11-7y 3 IPUC Form 4 Rev. April 2023