HomeMy WebLinkAboutIntermountain Gas 230403-06 IGC Shelley Construction Idaho PUC Pipeline Safety Inspection Summary
Inspector(s): jPerkins Date(s): 3-6 Apr 2023
Company/Owner: lintermountain Gas Company(IGC) unit#/OPID 18160
Inspection Type&Time (1 day, 0.5 day) Total Inspection Days: 4
Standard: Construction:F4 Training:= (T)(D) Integrity Management: . Incident:
OQ:_� Damage Prevention: D&A:
Gas Rule: = Follow-up:
Inspection Summary
A construction inspection was performed on KV Utilities and GTUH&H X-ray contractors for
Intermountain Gas.
IPUC inspector traveled to Idaho Falls and observed contractors preparing 4300'of 10" steel pipeline for
replacement near 1108 E 715N in Shelley, Idaho. Observations included: line locating/marking, excavating,
trench safety, safety equipment,pre-heating, welding, wrapping,jeeping and x-raying welds.
Attachments
Construction Inspection Form 4
Contractor Qualification Records
Job packet/prints
Pyrometer/jeeping tool Calibration
Corrective Action Required: Yes No X
Follow-up Required: by (date):; Yes I No X
Inspector (Lead):
Date:
Perkins
r�.�__- z__. 4/6/2023
Reviewer:
Date:
Brooks 4/10/2023