Loading...
HomeMy WebLinkAboutIntermountain Gas 230403-06 IGC Shelley Construction Idaho PUC Pipeline Safety Inspection Summary Inspector(s): jPerkins Date(s): 3-6 Apr 2023 Company/Owner: lintermountain Gas Company(IGC) unit#/OPID 18160 Inspection Type&Time (1 day, 0.5 day) Total Inspection Days: 4 Standard: Construction:F4 Training:= (T)(D) Integrity Management: . Incident: OQ:_� Damage Prevention: D&A: Gas Rule: = Follow-up: Inspection Summary A construction inspection was performed on KV Utilities and GTUH&H X-ray contractors for Intermountain Gas. IPUC inspector traveled to Idaho Falls and observed contractors preparing 4300'of 10" steel pipeline for replacement near 1108 E 715N in Shelley, Idaho. Observations included: line locating/marking, excavating, trench safety, safety equipment,pre-heating, welding, wrapping,jeeping and x-raying welds. Attachments Construction Inspection Form 4 Contractor Qualification Records Job packet/prints Pyrometer/jeeping tool Calibration Corrective Action Required: Yes No X Follow-up Required: by (date):; Yes I No X Inspector (Lead): Date: Perkins r�.�__- z__. 4/6/2023 Reviewer: Date: Brooks 4/10/2023 IPUC Form 1