Inspector(s): JBrooks Date(s): 22-Mar-23
Company/Owner: Intermountain Gas Company(IGC) I Unit#/OPID 18160
Inspection Type&Time (1 day, 0.5 day) ITotal Inspection Days:11
Standard:F] Construction: 71 Training: r7 (T)(D)Integrity Management: Incident:
M/M: = Follow-up: OQ: Damage Prevention: D&A:
Inspection Summary
A construction inspection was performed on Das-Co, a contractor for IGC.
IPUC inspector observed Das-Co crew install a PE, 4", section of main line along Happy Valley Road in
Nampa. Observations included: Trenching, equipment calibrations, safety equipment,butt fusion, tracer
wire and bedding with sand. An unacceptable fusion was identified by the fuser and was rejected,
removed, and a new (acceptable) fusion was made.
Attachments:
Construction Inspection Form 4
Das-Co Daily Line-Up
Operator Qualification Records
Corrective Action Required: Yes No X
Follow-up Required: by (date): Yes I Nol X
Inspector (Lead):
Date:
Brooks — 3/22/2023
Reviewer:
Date: