HomeMy WebLinkAboutIntermountain Gas 230322 IGC Nampa Construction Idaho PUC Pipeline Safety Inspection Summary Inspector(s): JBrooks Date(s): 22-Mar-23 Company/Owner: Intermountain Gas Company(IGC) I Unit#/OPID 18160 Inspection Type&Time (1 day, 0.5 day) ITotal Inspection Days:11 Standard:F] Construction: 71 Training: r7 (T)(D)Integrity Management: Incident: M/M: = Follow-up: OQ: Damage Prevention: D&A: Inspection Summary A construction inspection was performed on Das-Co, a contractor for IGC. IPUC inspector observed Das-Co crew install a PE, 4", section of main line along Happy Valley Road in Nampa. Observations included: Trenching, equipment calibrations, safety equipment,butt fusion, tracer wire and bedding with sand. An unacceptable fusion was identified by the fuser and was rejected, removed, and a new (acceptable) fusion was made. Attachments: Construction Inspection Form 4 Das-Co Daily Line-Up Operator Qualification Records Corrective Action Required: Yes No X Follow-up Required: by (date): Yes I Nol X Inspector (Lead): Date: Brooks — 3/22/2023 Reviewer: Date: IPUC Form 1