Loading...
HomeMy WebLinkAboutIntermountain Gas 230321-22 IGC Eagle Construction Idaho PUC Pipeline Safety Inspection Summary Inspector(s): jPerkins, Galli I Date(s): 21-22 Mar 23 Company/Owner: I Intermountain Gas Company(IGC) I Unit#/OPID 18160 Inspection Type&Time (1 day, 0.5 day) I Total Inspection Days: 3 Standard:71 Construction:5 Training: F7 (T)(D)Integrity Management: Incident: M/M: = Follow-up: OQ: Damage Prevention: D&A: Inspection Summary A construction inspection was performed on Das-Co, a contractor for IGC. IPUC inspectors observed Das-Co crew tie in a 210' section of 4" main line to N Ballantyne Ln. Observations included: Trenching, equipment calibrations, safety equipment,butt fusion, tracer wire, pigging, boring and pull-back . All IGC procedures were followed. Attachments: Construction Inspection Form 4 Das-Co Daily Line-Up Operator Qualification Records Corrective Action Required: Yes No X Follow-up Required: by (date): 1 7 Yes I Nol X Inspector (Lead): Perkins r=' Date: 3/22/2023 Reviewer: Date: Brooks IPUC Form 1