Loading...
HomeMy WebLinkAboutIntermountain Gas 230314 IGC Boise Construction Idaho PUC Pipeline Safety Inspection Summary Inspector(s): jPerkins I Date(s): 14-Mar-23 Company/Owner: lintermountain Gas Company(IGC) I Unit#/OPID 8160 Inspection Type&Time (1 day, 0.5 day) I Total Inspection Days:11 Standard:FI Construction:51-1 Training: F__] (T)(D) Integrity Management: Incident: M/M: = Follow-up: OQ: Damage Prevention: D&A: Inspection Summary A construction inspection was performed on Das-Co, a contractor for IGC. IPUC inspectors observed Das-Co crew install new service line to 6916 W Garden Glen in Boise. Observations included: Trenching, equipment calibrations, safety equipment,butt fusion, stab fitting, bolt on tapping tee,purging, EFV, tracer wire, pressure test and bedding . All IGC procedures were followed. Attachments: Construction Inspection Form 4 Das-Co Daily Line-Up Operator Qualification Records Corrective Action Required: Yes I Nol X Follow-up Required: by (date): Yes No X Inspector(Lead): Perkins Date: 3/14/2023 Reviewer: Date: Brooks IPUC Form 1