HomeMy WebLinkAboutIntermountain Gas 230314 IGC Boise Construction Idaho PUC Pipeline Safety Inspection Summary
Inspector(s): jPerkins I Date(s): 14-Mar-23
Company/Owner: lintermountain Gas Company(IGC) I Unit#/OPID 8160
Inspection Type&Time (1 day, 0.5 day) I Total Inspection Days:11
Standard:FI Construction:51-1 Training: F__] (T)(D) Integrity Management: Incident:
M/M: = Follow-up: OQ: Damage Prevention: D&A:
Inspection Summary
A construction inspection was performed on Das-Co, a contractor for IGC.
IPUC inspectors observed Das-Co crew install new service line to 6916 W Garden Glen in Boise.
Observations included: Trenching, equipment calibrations, safety equipment,butt fusion, stab fitting,
bolt on tapping tee,purging, EFV, tracer wire, pressure test and bedding . All IGC procedures were
followed.
Attachments:
Construction Inspection Form 4
Das-Co Daily Line-Up
Operator Qualification Records
Corrective Action Required: Yes I Nol X
Follow-up Required: by (date): Yes No X
Inspector(Lead):
Perkins Date: 3/14/2023
Reviewer: Date:
Brooks
IPUC Form 1