Loading...
HomeMy WebLinkAboutIntermountain Gas 230309 IGC Eagle Construction Idaho PUC Pipeline Safety Inspection Summary Inspector(s): I Brooks, Galli Date(s): 3/9/2023 Company/Owner: llntermountain Gas Company (IGC) Unit#/OPID 8160 Inspection Type &Time (1 day, 0.5 day) Total Inspection Days: 1 Standard: Construction: 1 Training: (T)(D)Integrity Management: Inadent Gas Rule: Follow-up: 0 ' Damage Prevention: D&A: Inspection Summary A constuction inspection was performed on Track Utilities a contrator for Intermountain Gas Company. March 9,2023: (1.0) Construction IPUC Inspectors observed a Track Utilities crew install a 2 inch PE main with 3/ inch service stubs at 16145, 16146 and 16148 N Truman Ave in Eagle, ID. Observations included: proper trench clearance/depth,tracer wire, saddle T's, stab fittings and bedding with sand. All activity was performed in compliance with IGC Operations and Maintenance Manual. Attachments: Construction Inspection Form 4 Track Utilities Daily Line-Up Operator Qualification Records Corrective Action Required: Yes I Nol X Follow-up Required: by (date):; Yes I Nol X Inspector (Lead): Date: Brooks 3/9/2023 Reviewer: Date: IPUC Form 1