HomeMy WebLinkAboutIntermountain Gas 230308 IGC Meridian Construction Idaho PUC Pipeline Safety Inspection Summary
Inspector(s): JBrooks, Galli I Date(s): 8-Mar-23
Company/Owner: I Intermountain Gas Company(IGC) I Unit#/OPID 8160
Inspection Type&Time (1 day, 0.5 day) ITotal Inspection Days: 2
Standard:F� Construction: F-2] Training: F7 (T)(D) Integrity Management: Incident:
M/M: = Follow-up: Oct: Damage Prevention: D&A:
Inspection Summary
A construction inspection was performed on Das-Co, a contractor for IGC.
IPUC inspectors observed Das-Co crew install new service lines to 1699 W Naxos St and 61788 W
Karpathos in Meridian. Observations included: Trenching, equipment calibrations, safety equipment,
butt fusion,purging, tracer wire and bedding with sand. An unacceptable fusion was identified but was
rejected, removed, and a new fusion was made per consult with an IGC FOC.
Attachments:
Construction Inspection Form 4
Das-Co Daily Line-Up
Operator Qualification Records
Corrective Action Required: Yes No X
Follow-up Required: by (date): Yes No X
Inspector (Lead):
Date:
Brooks 3/8/2023
Reviewer:
Date: 3/8/2023
IPUC Form 1