HomeMy WebLinkAboutIntermountain Gas 230307 IGC Eagle Construction Idaho PUC Pipeline Safety Inspection Summary
Inspector(s): 113rooks, Galli I Date(s): 3/7/23
Company/Owner: I Intermountain Gas Company(IGC) Unit#/OPID 18160
Inspection Type&Time (1 day, 0.5 day) I Total Inspection Days:11
Standard: 1-1 Construction: � Training: F—] (T)(D) Integrity Management: Incident:
Gas Rule: = Follow-up: Oct: Damage Prevention: D&A:
Inspection Summary
A construction inspection was performed on Das-Co, a contractor for IGC.
IPUC inspectors observed Das-Co crew install a new service line to 100 S Urban Gate Ave, in Eagle, ID.
Observations included: pressure testing, fusing, compression fittings, EFV install, purging, tracer wire,
bedding, and backfilling. All procedures were followed in accordance with the IGC Operation and
Maintenance Manual.
Attachments:
Construction Inspection Form 4
Das-Co Daily Line-Up
Operator Qualification Records
Corrective Action Required: Yes No X
Follow-up Required: by (date): Yes Nol X
Inspector (Lead):
Date:
Brooks 3/7/2023
Reviewer:
Date:
IPUC Form 1