Loading...
HomeMy WebLinkAboutIntermountain Gas 230307 IGC Eagle Construction Idaho PUC Pipeline Safety Inspection Summary Inspector(s): 113rooks, Galli I Date(s): 3/7/23 Company/Owner: I Intermountain Gas Company(IGC) Unit#/OPID 18160 Inspection Type&Time (1 day, 0.5 day) I Total Inspection Days:11 Standard: 1-1 Construction: � Training: F—] (T)(D) Integrity Management: Incident: Gas Rule: = Follow-up: Oct: Damage Prevention: D&A: Inspection Summary A construction inspection was performed on Das-Co, a contractor for IGC. IPUC inspectors observed Das-Co crew install a new service line to 100 S Urban Gate Ave, in Eagle, ID. Observations included: pressure testing, fusing, compression fittings, EFV install, purging, tracer wire, bedding, and backfilling. All procedures were followed in accordance with the IGC Operation and Maintenance Manual. Attachments: Construction Inspection Form 4 Das-Co Daily Line-Up Operator Qualification Records Corrective Action Required: Yes No X Follow-up Required: by (date): Yes Nol X Inspector (Lead): Date: Brooks 3/7/2023 Reviewer: Date: IPUC Form 1