Loading...
HomeMy WebLinkAboutIntermountain Gas 230223 IGC Boise Construction Idaho PUC Pipeline Safety Inspection Summary Inspector(s): jPerkins I Date(s): 2/23/23 Company/Owner: Intermountain Gas Company (IGC) I Unit#/OPID 18160 Inspection Type&Time (1 day, 0.5 day) I Total Inspection Days: 1 Standard:F1 Construction:FTI Training: F-] (T)(D)Integrity Management: El Incident: F7 Gas Rule: F-1 Follow-up: F-1 oQ: F1 Damage Prevention: F1 D&A: Inspection Summary A construction inspection was performed on Das-Co, a contractor for IGC. IPUC inspector observed Das-Co crew install a new service line to 1613 S Vermont, in Boise, ID. Observations included: line squeezing, pressure testing, fusing, stab fittings, EFV install, purging, tracer wire,bedding, and backfilling. All procedures were followed in accordance with the IGC Operation and Maintenance Manual. Attachments: Construction Inspection Form 4 Das-Co Daily Line-Up Operator Qualification Records Corrective Action Required: Yes No X Follow-up Required: by (date): Yes jNoj X Inspector (Lead): Perkins ' Date: 2/23/2023 Reviewer: Date: Brooks IPUC Form 1