HomeMy WebLinkAboutIntermountain Gas 230223 IGC Boise Construction Idaho PUC Pipeline Safety Inspection Summary
Inspector(s): jPerkins I Date(s): 2/23/23
Company/Owner: Intermountain Gas Company (IGC) I Unit#/OPID 18160
Inspection Type&Time (1 day, 0.5 day) I Total Inspection Days: 1
Standard:F1 Construction:FTI Training: F-] (T)(D)Integrity Management: El Incident: F7
Gas Rule: F-1 Follow-up: F-1 oQ: F1 Damage Prevention: F1 D&A:
Inspection Summary
A construction inspection was performed on Das-Co, a contractor for IGC.
IPUC inspector observed Das-Co crew install a new service line to 1613 S Vermont, in Boise, ID.
Observations included: line squeezing, pressure testing, fusing, stab fittings, EFV install, purging, tracer
wire,bedding, and backfilling. All procedures were followed in accordance with the IGC Operation and
Maintenance Manual.
Attachments:
Construction Inspection Form 4
Das-Co Daily Line-Up
Operator Qualification Records
Corrective Action Required: Yes No X
Follow-up Required: by (date): Yes jNoj X
Inspector (Lead):
Perkins ' Date: 2/23/2023
Reviewer: Date:
Brooks
IPUC Form 1