HomeMy WebLinkAboutIntermountain Gas 230221-22 IGC Boise Construction Idaho PUC Pipeline Safety Inspection Summary Inspector(s): I Perkins, Brooks, Galli I Date(s): 2/21-22/2053 Company/Owner: I Intermountain Gas Company(IGC) Unit#/OPID 18160 Inspection Type&Time (1 day, 0.5 day) Total Inspection Days: 4 Standard: Construction:F4 Training: F_� (T)(D)Integrity Management: Incident: Gas Rule: Follow-up: OQ: Damage Prevention: D&A: Inspection Summary A construction inspection was performed on Das-Co, a contractor for IGC. IPUC inspectors observed a Das-Co crew excavate, line locate, install tracer wire, boring, coating removal, welding, wax wrapping, EFV 1800 install,butt fusion and successful pressure testing at 90 psi for 15 minutes for a new 3/4" service line from a 4" steel main at 2811 N Bogus Basin Rd, Boise ID. IGC FOC Chris Lua on-site. All procedures were followed in accordance with the IGC Operation and Maintenance Manual. Attachments Construction Inspection Form 4 Das-Co Daily Line-Up Operator Qualification Records Corrective Action Required: Yes Nol X Follow-up Required: by (date): Yes Nol X Inspector (Lead): 'f Date: Perkins 2/22/2023 Reviewer: Brooks Date: 2/22/2023 IPUC Form 1