HomeMy WebLinkAboutIntermountain Gas 230221-22 IGC Boise Construction Idaho PUC Pipeline Safety Inspection Summary
Inspector(s): I Perkins, Brooks, Galli I Date(s): 2/21-22/2053
Company/Owner: I Intermountain Gas Company(IGC) Unit#/OPID 18160
Inspection Type&Time (1 day, 0.5 day) Total Inspection Days: 4
Standard: Construction:F4 Training: F_� (T)(D)Integrity Management: Incident:
Gas Rule: Follow-up: OQ: Damage Prevention: D&A:
Inspection Summary
A construction inspection was performed on Das-Co, a contractor for IGC.
IPUC inspectors observed a Das-Co crew excavate, line locate, install tracer wire, boring, coating
removal, welding, wax wrapping, EFV 1800 install,butt fusion and successful pressure testing at 90 psi
for 15 minutes for a new 3/4" service line from a 4" steel main at 2811 N Bogus Basin Rd, Boise ID.
IGC FOC Chris Lua on-site. All procedures were followed in accordance with the IGC Operation and
Maintenance Manual.
Attachments
Construction Inspection Form 4
Das-Co Daily Line-Up
Operator Qualification Records
Corrective Action Required: Yes Nol X
Follow-up Required: by (date): Yes Nol X
Inspector (Lead): 'f Date:
Perkins 2/22/2023
Reviewer:
Brooks
Date: 2/22/2023
IPUC Form 1