Inspector(s): lBrooks Date(s): 2/21/23
Company/Owner: Intermountain Gas Company(IGC) Unit#/OPID 18160
Inspection Type &Time (1 day, 0.5 day) ITotal Inspection Days: 1
Standard:FI Construction: 71 1 Training: F-] (T)(D)Integrity Management: Incident:
Gas Rule: = Follow-up: OQ: Damage Prevention: D&A:
Inspection Summary
A construction inspection was performed on Das-Co, a contractor for IGC.
IPUC inspector observed Das-Co crew install a new service line to 16962 and 12340 Breton Way, and
at 13570 Nisene Dr, in Caldwell, ID. Observations included: line squeezing, pressure testing, fusing,
stab fittings, EFV install, purging, tracer wire, bedding, and backfilling. All procedures were followed in
accordance with the IGC Operation and Maintenance Manual.
Attachments:
Construction Inspection Form 4
Das-Co Daily Line-Up
Operator Qualification Records
Corrective Action Required: Yes No X
Follow-up Required: by (date): Yes jNoj X
Inspector (Lead): Date:
Brooks 2/21/2023
Reviewer:
Date: