Loading...
HomeMy WebLinkAboutIntermountain Gas 230221 IGC Caldwell Construction Idaho PUC Pipeline Safety Inspection Summary Inspector(s): lBrooks Date(s): 2/21/23 Company/Owner: Intermountain Gas Company(IGC) Unit#/OPID 18160 Inspection Type &Time (1 day, 0.5 day) ITotal Inspection Days: 1 Standard:FI Construction: 71 1 Training: F-] (T)(D)Integrity Management: Incident: Gas Rule: = Follow-up: OQ: Damage Prevention: D&A: Inspection Summary A construction inspection was performed on Das-Co, a contractor for IGC. IPUC inspector observed Das-Co crew install a new service line to 16962 and 12340 Breton Way, and at 13570 Nisene Dr, in Caldwell, ID. Observations included: line squeezing, pressure testing, fusing, stab fittings, EFV install, purging, tracer wire, bedding, and backfilling. All procedures were followed in accordance with the IGC Operation and Maintenance Manual. Attachments: Construction Inspection Form 4 Das-Co Daily Line-Up Operator Qualification Records Corrective Action Required: Yes No X Follow-up Required: by (date): Yes jNoj X Inspector (Lead): Date: Brooks 2/21/2023 Reviewer: Date: IPUC Form 1