Loading...
HomeMy WebLinkAboutIntermountain Gas 230213 IGC Kuna Construction Idaho PUC Pipeline Safety Inspection Summary Inspector(s): jPerkins, Galli I Date(s): 13-Feb-23 Company/Owner: lintermountain Gas Company(IGC) jUnit#/OPID 8160 Inspection Type&Time (1 day, 0.5 day) Total Inspection Days: 2 Standard:FI Construction: F2 Training: F—] (T)(D) Integrity Management: Incident: a Gas Rule: = Follow-up: OQ: Damage Prevention: D&A: Inspection Summary A construction inspection was performed on Das-Co a contractor for IGC. IPUC inspectors observed Das-Co crew install new service lines to 11075 & 11260 Yeoman Place, Kuna, ID. Observations included: line squeezing, successful pressure test at 90 psi for 15 minutes,butt fusion, EFV 1200 install, purging, tracer wire,bedding, and backfilling. All procedures were followed in accordance with the IGC Operation and Maintenance Manual. Attachments: Construction Inspection Form 4 Das-Co Daily Line-Up Operator Qualification Records Corrective Action Required: Yes I Nol X Follow-up Required: by ( ate): YesI Nol X Inspector (lead): Date: Perkins � '�� ���— 2/13/2023 Reviewer: Brooks Date: 2/13/2023 ff IPUC Form 1