Loading...
HomeMy WebLinkAboutIntermountain Gas 230208-09 IGC Boise Construction Idaho PUC Pipeline Safety Inspection Summary Inspector(s): jPerkins Date(s): 2/8-9/2023 Company/Owner: Intermountain Gas Company (IGC) Unit#/OPID 8160 Inspection Type &Time (1 day, 0.5 day) Total Inspection Days: 2 Standard:F-] Construction:F2 Training: F--] (T)(D) Integrity Management: Incident: Gas Rule: = Follow-up: OQ: Damage Prevention: D&A: Inspection Summary A construction inspection was preformed on Das-Co a contractor for IGC. IPUC inspector observed Das-Co crew install new service lines to 3111 & 3231 E Barber Valley Dr in Boise, ID. Observations included: line locating, pressure testing, stab fittings, fusing, EFV install, purging, tracer wire,bedding and backfilling. All procedures were followed in accordance with IGC Operation and Maintenance Manual. Attachments: Construction Inspection Form 4 Das-Co Daily Line-Up Operator Qualification Records Corrective Action Required: Yes No X Follow-up Required: by (date): Yes No X Inspector (Lead): Perkins _ „_- Date: 2/9/2023 Reviewer: Brooks Date: 2/9/2023 IPUC Form 1