HomeMy WebLinkAboutIntermountain Gas 230208-09 IGC Boise Construction Idaho PUC Pipeline Safety Inspection Summary
Inspector(s): jPerkins Date(s): 2/8-9/2023
Company/Owner: Intermountain Gas Company (IGC) Unit#/OPID 8160
Inspection Type &Time (1 day, 0.5 day) Total Inspection Days: 2
Standard:F-] Construction:F2 Training: F--] (T)(D) Integrity Management: Incident:
Gas Rule: = Follow-up: OQ: Damage Prevention: D&A:
Inspection Summary
A construction inspection was preformed on Das-Co a contractor for IGC.
IPUC inspector observed Das-Co crew install new service lines to 3111 & 3231 E Barber Valley Dr in
Boise, ID. Observations included: line locating, pressure testing, stab fittings, fusing, EFV install,
purging, tracer wire,bedding and backfilling. All procedures were followed in accordance with IGC
Operation and Maintenance Manual.
Attachments:
Construction Inspection Form 4
Das-Co Daily Line-Up
Operator Qualification Records
Corrective Action Required: Yes No X
Follow-up Required: by (date): Yes No X
Inspector (Lead):
Perkins _ „_- Date: 2/9/2023
Reviewer:
Brooks Date: 2/9/2023
IPUC Form 1