HomeMy WebLinkAboutIntermountain Gas 230208 IGC Meridian Construction Idaho PUC Pipeline Safety Inspection Summary
Inspector(s): 113rooks, Galli Date(s): 8-Feb-23
Company/Owner: Intermountain Gas Company(IGC) Unit#/OPID 18160
Inspection Type&Time (1 day, 0.5 day) ITotal Inspection Days: 1.5
Standard:FI Construction: 1.5 Training: F__� (T)(D)Integrity Management: El Incident:
Gas Rule: = Follow-up: OQ: Damage Prevention: D&A:
Inspection Summary
A construction inspection was preformed on Das-Co a contractor for IGC.
IPUC inspector observed Das-Co crew install a new service line to 6141 S Ostrum Ave, in Meridian.
Observations included: line squeezing, pressure testing, fusing, EFV install,purging, tracer wire,
bedding, and backfilling. All procedures were followed in accordance with the IGC Operation and
Maintenance Manual.
Attachments:
Construction Inspection Form 4
Das-Co Daily Line-Up
Operator Qualification Records
Corrective Action Required: Yes I Nol X
Follow-up Required: by (date): Yes No X
Inspector(Lead): Date:
Brooks 2/8/2023
Reviewer:
Date:
IPUC Form 1