Loading...
HomeMy WebLinkAboutIntermountain Gas 230208 IGC Meridian Construction Idaho PUC Pipeline Safety Inspection Summary Inspector(s): 113rooks, Galli Date(s): 8-Feb-23 Company/Owner: Intermountain Gas Company(IGC) Unit#/OPID 18160 Inspection Type&Time (1 day, 0.5 day) ITotal Inspection Days: 1.5 Standard:FI Construction: 1.5 Training: F__� (T)(D)Integrity Management: El Incident: Gas Rule: = Follow-up: OQ: Damage Prevention: D&A: Inspection Summary A construction inspection was preformed on Das-Co a contractor for IGC. IPUC inspector observed Das-Co crew install a new service line to 6141 S Ostrum Ave, in Meridian. Observations included: line squeezing, pressure testing, fusing, EFV install,purging, tracer wire, bedding, and backfilling. All procedures were followed in accordance with the IGC Operation and Maintenance Manual. Attachments: Construction Inspection Form 4 Das-Co Daily Line-Up Operator Qualification Records Corrective Action Required: Yes I Nol X Follow-up Required: by (date): Yes No X Inspector(Lead): Date: Brooks 2/8/2023 Reviewer: Date: IPUC Form 1