HomeMy WebLinkAboutIntermountain Gas 230207 IGC Parma Construction Idaho PUC Pipeline Safety Inspection Summary
Inspector(s): jPerkins I Date(s): 7-Feb-23
Company/Owner: Intermountain Gas Company(IGC) I Unit#/OPID 18160
Inspection Type&Time (1 day, 0.5 day) I Total Inspection Days: 1
Standard:F-1 Construction:FTI Training: F-] (T)(D)Integrity Management: F7 Incident:
Gas Rule: F-1 Follow-up: Oct: Damage Prevention: D&A:
Inspection Summary
A construction inspection was preformed on Das-Co a contractor for IGC.
IPUC inspector observed Das-CO crew install new service lines to 1202,1204 and 1207 Oak St in Parma,
ID. Observations included: line locating,pressure testing, stab fittings, fusing, EFV install, purging,
tracer wire, bedding and backfilling. All procedures were followed in accordance with IGC Operation
and Maintenance Manual.
Attachments:
Construction Inspection Form 4
Das-Co Daily Line-Up
Operator Qualification Records
Corrective Action Required: Yes No X
Follow-up Required: by (date): Yes Nol X
Inspector (Lead): , ?
Date:
Perkins Z. 2/7/2023
Reviewer: Date:
Brooks 2/7/2023
IPUC Form 1