Loading...
HomeMy WebLinkAboutIntermountain Gas 230207 IGC Parma Construction Idaho PUC Pipeline Safety Inspection Summary Inspector(s): jPerkins I Date(s): 7-Feb-23 Company/Owner: Intermountain Gas Company(IGC) I Unit#/OPID 18160 Inspection Type&Time (1 day, 0.5 day) I Total Inspection Days: 1 Standard:F-1 Construction:FTI Training: F-] (T)(D)Integrity Management: F7 Incident: Gas Rule: F-1 Follow-up: Oct: Damage Prevention: D&A: Inspection Summary A construction inspection was preformed on Das-Co a contractor for IGC. IPUC inspector observed Das-CO crew install new service lines to 1202,1204 and 1207 Oak St in Parma, ID. Observations included: line locating,pressure testing, stab fittings, fusing, EFV install, purging, tracer wire, bedding and backfilling. All procedures were followed in accordance with IGC Operation and Maintenance Manual. Attachments: Construction Inspection Form 4 Das-Co Daily Line-Up Operator Qualification Records Corrective Action Required: Yes No X Follow-up Required: by (date): Yes Nol X Inspector (Lead): , ? Date: Perkins Z. 2/7/2023 Reviewer: Date: Brooks 2/7/2023 IPUC Form 1