Loading...
HomeMy WebLinkAboutIntermountain Gas 230207 IGC Nampa Construction Idaho PUC Pipeline Safety Inspection Summary Inspector(s): 113rooks 11 Date(s): 2/7/23 Company/Owner: Intermountain Gas Company(IGC) I Unit#/OPID 18160 Inspection Type&Time (1 day, 0.5 day) Total Inspection Days: 1 Standard:FI ConstructionT T] Training: (T)(D)Integrity Management: Incident: Gas Rule: = Follow-up: OQ: Damage Prevention: D&A: Inspection Summary A construction inspection was preformed on Das-Co a contractor for IGC. IPUC inspector observed Das-Co crew install new service lines to 17711 Jackson Ridge Way,17680 and 17672 Barefoot Ridge Way, in Nampa. Observations included: line squeezing,pressure testing, stab fittings, fusing, EFV install, purging, tracer wire, bedding, and backfilling. All procedures were followed in accordance with IGC's Operation and Maintenance Manual. Attachments: Construction Inspection Form 4 Das-Co Daily Line-Up Operator Qualification Records Corrective Action Required: Yes No X Follow-up Required: by (date): Yes No X Inspector (lead): Brooks Date: 2/7/2023 Reviewer: Date: IPUC Form 1