HomeMy WebLinkAboutIntermountain Gas 230207 IGC Nampa Construction Idaho PUC Pipeline Safety Inspection Summary
Inspector(s): 113rooks 11 Date(s): 2/7/23
Company/Owner: Intermountain Gas Company(IGC) I Unit#/OPID 18160
Inspection Type&Time (1 day, 0.5 day) Total Inspection Days: 1
Standard:FI ConstructionT T] Training: (T)(D)Integrity Management: Incident:
Gas Rule: = Follow-up: OQ: Damage Prevention: D&A:
Inspection Summary
A construction inspection was preformed on Das-Co a contractor for IGC.
IPUC inspector observed Das-Co crew install new service lines to 17711 Jackson Ridge Way,17680 and
17672 Barefoot Ridge Way, in Nampa. Observations included: line squeezing,pressure testing, stab
fittings, fusing, EFV install, purging, tracer wire, bedding, and backfilling. All procedures were followed
in accordance with IGC's Operation and Maintenance Manual.
Attachments:
Construction Inspection Form 4
Das-Co Daily Line-Up
Operator Qualification Records
Corrective Action Required: Yes No X
Follow-up Required: by (date): Yes No X
Inspector (lead):
Brooks
Date: 2/7/2023
Reviewer:
Date:
IPUC Form 1