HomeMy WebLinkAboutIntermountain Gas 230131 IGC Kimberly Construction Idaho PUC Pipeline Safety Inspection Summary
Inspector(s): jPerkins Date(s): 31-Jan-23
Company/Owner: Intermountain Gas Company(IGC) I Unit#/OPID 18160
Inspection Type&Time (1 day,0.5 day) Total Inspection Days: 1
Standard:F-] Construction:71 Training: F-] (T)(D) Integrity Management: E] Incident:
Gas Rule: = Follow-up: OQ: Damage Prevention: D&A:
Inspection Summary
A construction inspection was performed on KV-Utilities a contractor for IGC.
IPUC inspector observed KV-Utilities crew install a new service line to 1022 Trapper Peak in Kimberly,
ID. Observations included: line locating, pressure testing, stab fittings, EFV install, tracer wire, bedding
and backfilling. All procedures were followed in accordance with IGC Operation and Maintenance
Manual.
Attachments:
Construction Inspection Form 4
KV-Utilities Daily Line-Up
Operator Qualification Records
Corrective Action Required: Yes I Nol X
Follow-up Required: by (date): Yes I Nol X
Inspector(Lead):
Perkins Date: 1/31/2023
Reviewer:
Brooks Date: 1/31/2023
14 1
IPUC Form 1