Loading...
HomeMy WebLinkAboutIntermountain Gas 230131 IGC Kimberly Construction Idaho PUC Pipeline Safety Inspection Summary Inspector(s): jPerkins Date(s): 31-Jan-23 Company/Owner: Intermountain Gas Company(IGC) I Unit#/OPID 18160 Inspection Type&Time (1 day,0.5 day) Total Inspection Days: 1 Standard:F-] Construction:71 Training: F-] (T)(D) Integrity Management: E] Incident: Gas Rule: = Follow-up: OQ: Damage Prevention: D&A: Inspection Summary A construction inspection was performed on KV-Utilities a contractor for IGC. IPUC inspector observed KV-Utilities crew install a new service line to 1022 Trapper Peak in Kimberly, ID. Observations included: line locating, pressure testing, stab fittings, EFV install, tracer wire, bedding and backfilling. All procedures were followed in accordance with IGC Operation and Maintenance Manual. Attachments: Construction Inspection Form 4 KV-Utilities Daily Line-Up Operator Qualification Records Corrective Action Required: Yes I Nol X Follow-up Required: by (date): Yes I Nol X Inspector(Lead): Perkins Date: 1/31/2023 Reviewer: Brooks Date: 1/31/2023 14 1 IPUC Form 1