Loading...
HomeMy WebLinkAboutIntermountain Gas 230130 IGC Delco Construction Idaho PUC Pipeline Safety Inspection Summary Inspector(s): Perkins Date(s): 30-Jan-23 Company/Owner: Intermountain Gas Company(IGC) Unit#/OPID 18160 Inspection Type&Time(1 day, 0.5 day) Total Inspection Days: 1 Standard:71 Construction:F-1-] Training: F-] (T)(D)Integrity Management: F1 Incident: Gas Rule: F_1 Follow-up: F-1 oQ: F-1 Damage Prevention: E= D&A: Inspection Summary A construction inspection was performed on KV-Utilities a contractor for IGC. IPUC inspector observed KV-Utilities crew install a new service line to 314 W Main St in Declo, ID. Observations included: welding tie-in to 2" steel line using tapping tee, pressure testing, coating/wrapping of steel line,bedding,backfilling, tracer wire and EFV install. Pressure gauge had expired calibration sticker,but was provided with calibration sheet. All procedures were followed in accordance with IGC Operation and Maintenance Manual. Attachments: Construction Inspection Form 4 KV-Utilities Daily Line-Up Operator Qualification Records Corrective Action Required: Yes No X Follow-up Required: by (date): Yes No X Inspector(Lead): Perkins Date: 1/30/2023 Reviewer: Date: Brooks 1/30/2023 IPUC Form 1