HomeMy WebLinkAboutIntermountain Gas 230126 IGC Nampa Construction Idaho PUC Pipeline Safety Inspection Summary
Inspector(s): I Perkins, Brooks, Galli I Date(s): 26-Jan-23
Company/Owner: I Intermountain Gas Company (IGC) I Unit#/OPID 18160
Inspection Type&Time (1 day,0.5 day) Total Inspection Days: 3
Standard: Construction: F3 Training: (T)(D) Integrity Management: Incident:
Gas Rule: Follow-up: Oct: Damage Prevention: D&A:
Inspection Summary
A construction inspection was preformed on Das-Co a contractor for IGC.
IPUC inspectors observed IGC Crew and Das-Co abandon and divert approximately 200 feet of a 4"
steel main to remove an existing patrol near the intersection of Lone Star and Cobblestone in Nampa,
ID. Observations included: Bagging of adjacent house using IGC gas cart, tie-in/hot tapping x2, welded
on a blow down valve by Das-Co Welder Bierwirth, purging with nitrogen and wrap removal using
proper asbestos precautions. IGC FOC Russo and Del Torro were on-site. IGC QA Hall on-site. All
procedures were followed in accordance with IGC Operation and Maintenance Manual.
Attachments:
Construction Inspection Form 4
DASCO Daily Line-Up
Operator Qualification Records
Corrective Action Required: Yes No X
Follow-up Required: by (date): YesI Nol X
Inspector (Lead):
Perkins ,d7 Date: 1/26/2023
Reviewer:
Date:
Brooks 1/26/2023