Loading...
HomeMy WebLinkAboutIntermountain Gas 230125 IGC Star Construction Idaho PUC Pipeline Safety Inspection Summary Inspector(s): I Perkins, Galli Date(s): 1/25/2023 Company/Owner: I Intermountain Gas Company(IGC) Unit#/OPID 8160 Inspection Type&Time (1 day, 0.5 day) Total Inspection Days: 2 Standard: Construction: 2 Training: (T)(D)Integrity Management: Incident Gas Rule Follow-up: OQ: Damage Prevention: D&A. Inspection Summary A construction inspection was preformed on Das-co, a contractor for Intermountain Gas Company. 25 January 2023 (2.0) construction,typed reports IPUC inspectors observed contractors install a 3/4" PE split service gas line from a 3/4" PE stub at 946 and 968 N River Mist Place, Star, ID. Observations included: trenching, backfilling, line locating, tracer wire,butt fusion, EFV 1200 installation, stab fittings, successful pressure test at 90 psi for 15 minutes and squeeze off procedures. Quizzed employees on applicable AOCs. Notified IGC FOC Russo of improper butt fusion due to misalignment, uneven roll-back and damage to the pipe. Butt fusion was redone at the request of IGC. FOC Russo was on-site. Attachments: Construction Inspection Form 4 DASCO Daily Line-Up Operator Qualification Records Corrective Action Required: Yes I No IX Follow-up Required: by (date):; y Yes I No IX � InsI?ector(Lead): Date: 1/25/2023 Perkins Reviewer: Date: 1/25/2023 Brooks IPUC Form 1