HomeMy WebLinkAboutIntermountain Gas 230117 IGC Boise Construction Idaho PUC Pipeline Safety Inspection Summary Inspector(s): JPerkins, Brooks, Galli I Date(s): 17-Jan-23 Company/Owner: Intermountain Gas Company(IGC) I unit#/OPID 18160 Inspection Type&Time (1 day, 0.5 day) Total Inspection Days: 3 Standard:F-] Construction:F3 Training: F7 (T)(D) Integrity Management: Incident: Gas Rule: = Follow-up: OQ: Damage Prevention: D&A: Inspection Summary A construction inspection was preformed on Das-co, a contractor for Intermountain Gas Company. 17 January 2023 (3.0) construction,typed reports IPUC inspectors observed contractors install a 3/4" service line to 5574 N Eagle Drive, Boise, ID from 2" PE. Observations included: coring, line locating,boring, trenching, tracer wire, EFV 1200 installation and butt fusion. Quizzed employees on applicable AOCs. All procedures were followed in accordance with IGC operations and maintenance manual. IGC FOC Chris Lua on site. This job will be a two part job due to contractor activity in the ROW adjacent to the building. Attachments Construction Inspection Form 4 DASCO Daily Line-Up Operator Qualification Records Corrective Action Required: Yes I No IX Follow-up Required: by (date): Yes I No IX Inspector(Lead): f ' Date: Perkins 1/18/2023 Reviewer: Date: Brooks 1/18/2023 IPUC Form 1