HomeMy WebLinkAboutIntermountain Gas 230112 IGC Meridian Construction Idaho PUC Pipeline Safety Inspection Summary
Inspector(s): I Perkins, Galli I Date(s): 12-Jan-23
Company/Owner: I Intermountain Gas Company(IGC) I Unit#/OPID 18160
Inspection Type&Time(1 day, 0.5 day) I Total Inspection Days: 2
Standard:F—] Construction: F2 Training: F7 (T)(D)Integrity Management: El Incident:
Gas Rule: F] Follow-up: F-1 oQ: Damage Prevention: D&A:
Inspection Summary
A construction inspection was preformed on Das-co, a contractor for Intermountain Gas Company.
12 January 23 (2.0) construction,typed reports
IPUC inspectors observed contractors install a 3/4" PE service line to 1883 N Jericho Road, Meridian
from the adjacent house. Observations included: trenching, tracer wire, EFV 1200 installation, stab
fittings, squeeze off procedures,pressure test at 90 for 15 minutes, bedding,backfill and observed IGC
service tech bag/gas up adjacent home so as not to lose gas pressure during tie-in, . Quizzed employees
on applicable AOCs. All procedures were followed in accordance with IGC operations and maintenance
manual. IGC FOC Joe Del La Torre on site.
Attachments:
Construction Inspection Form 4
DASCO Daily Line-Up
Operator Qualification Records
Corrective Action Required: Yes I No IX
Follow-up Required: by (date): Yes I NO IX
Inspector (Lead): Date: 1/12/2023
Perkins
Reviewer:
Date: 1/12/2023
Brooks ft
IPUC Form 1