Loading...
HomeMy WebLinkAboutIntermountain Gas 230112 IGC Meridian Construction Idaho PUC Pipeline Safety Inspection Summary Inspector(s): I Perkins, Galli I Date(s): 12-Jan-23 Company/Owner: I Intermountain Gas Company(IGC) I Unit#/OPID 18160 Inspection Type&Time(1 day, 0.5 day) I Total Inspection Days: 2 Standard:F—] Construction: F2 Training: F7 (T)(D)Integrity Management: El Incident: Gas Rule: F] Follow-up: F-1 oQ: Damage Prevention: D&A: Inspection Summary A construction inspection was preformed on Das-co, a contractor for Intermountain Gas Company. 12 January 23 (2.0) construction,typed reports IPUC inspectors observed contractors install a 3/4" PE service line to 1883 N Jericho Road, Meridian from the adjacent house. Observations included: trenching, tracer wire, EFV 1200 installation, stab fittings, squeeze off procedures,pressure test at 90 for 15 minutes, bedding,backfill and observed IGC service tech bag/gas up adjacent home so as not to lose gas pressure during tie-in, . Quizzed employees on applicable AOCs. All procedures were followed in accordance with IGC operations and maintenance manual. IGC FOC Joe Del La Torre on site. Attachments: Construction Inspection Form 4 DASCO Daily Line-Up Operator Qualification Records Corrective Action Required: Yes I No IX Follow-up Required: by (date): Yes I NO IX Inspector (Lead): Date: 1/12/2023 Perkins Reviewer: Date: 1/12/2023 Brooks ft IPUC Form 1