Loading...
HomeMy WebLinkAboutIntermountain Gas 230111 IGC Boise Construction Idaho PUC Pipeline Safety Inspection Summary Inspector(s): I Perkins, Galli I Date(s): 11-Jan-23 Company/Owner: I Intermountain Gas Company(IGC) I Unit#/OPID 18160 Inspection Type&Time (1 day,0.5 day) Total Inspection Days: 2 Standard:F-I Construction:F-2] Training: (T)(D)Integrity Management: Incident: Gas Rule: = Follow-up: OQ: Damage Prevention: D&A: Inspection Summary A construction inspection was preformed on DASCO a contractor for IGC. 11 January 23 (2.0) construction,typed reports IPUC inspectors observed contractors install a 3/4" PE gas line from a 2" steel main at 2880 W Bellomy Lane in Boise, ID. Observations included: trenching, line locating,boring approximately 75 feet to riser location, tracer wire,butt fusion, EFV 1200 installation. Quizzed employees on applicable AOCs. All procedures were followed in accordance with IGCs Operations and Maintenance Manual. Attachments: Construction Inspection Form 4 DASCO Daily Line-Up Operator Qualification Records Corrective Action Required: Yes No X Follow-up Required: by (date): Yes I Nol X Inspector (Lead): Date: 1/11/2023 Perkins Reviewer: Date: 1/11/2023 Brooks IPUC Form 1