Loading...
HomeMy WebLinkAboutIntermountain Gas 2023 IPUC Form 1 - Pocatello Field Idaho PUC Pipeline Safety Inspection Summary Inspector(s): 113rooks, Galli I Date(s): 7/24-25/2023 Company/Owner: I Intermountain Gas Company(IGC) I Unit#/OPID 18160 Inspection Type& Time (1 day, 0.5 day) Total Inspection Days:15.5 Standard: 1 5 Training: (T)(D) Integrity Management: Incident: Follow-up: I OQ: 10.51 Damage Prevention: D&A: Inspection Summary Audit consisted of IPUC inspectors Brooks and Galli inspecting field installed equipment for the Pocatello, Idaho inspection units.The PHMSA IA question set and IGC equipment listing were used as a guide throughout the audit to ensure all areas were completed/covered. January 9,2023: (0.5 Standard Prep) Prepared for IGC Pocatello Field Audit July 24 & 25, 2023: (2.0 Standard, 2.0 Travell Met with IGC company representatives in the Pocatello district office for in-brief and to begin field audit and review OQ records for all personnel taking part in the inspection. Regulator Stations: 48677-RS-59867, 48821-RS-59847, 48821-RS-60099, 48821-RS-59763, 48676-RS-60103, 48676-RS-60084, 48679-RS-60078,48679-RS-59788, 48679-RS-60083, 48679-RS-59741, 48679-RS-60112, 48679-RS-60116 were inspected for proper operation,regulator lock-up, relief device operation, cathodic protection pipe-to-soil readings,pipe-to soil interface wrap protection, station warning signs and right-of-way clearances. 10 casing-to-carrier isolation checks, 5 cathodic protection rectifiers, 8 pipeline patrols, and 15 emergency/ isolation valves were checked for proper operation, observations listed below. HPSS: Low CP of-0.82 mV was found on 48679-HPSS-70364 at 1299 Fore Road. This was a result of a recent lightning strike that hit a nearby rectifier. Inspectors observed the pipe re-polarizing over the two day inspection from-0.81 mV to -0.82 mV. IGC CP Supervisor Kelly stated they will be installing an anode near the HPSS to prevent a reoccurrence. Two HPSS's were found with small leaks by performing a bubble test,mitigated by proper thread engagement. Both were fixed on-site. An exit interview was performed following the district inspection with field personnel of Intermountain Gas Company. July 26,2023: (0.5 Standard Post, 0.5 OQ) Wrote inspection report, completed audit forms: PHMSA IA question set with OQ protocol 9, IPUC Form 1, Post Inspection Preliminary Written Findings and attached inspection documents. Attached: IPUC Form 1, Preliminary Written Findings, Field Equipment Work Sheets IPUC Form 1 Idaho PUC Pipeline Safety Inspection Summary Corrective Action Required: Yes No X Follow-up Required: by(date): Yes No X Inspector(Lead):_ Date: Galli L 7/26/2023 Reviewer: _ _____ Date:_._ _ . �_�.��_____,_ Brooks 7/26/2023 IPUC Form 1