HomeMy WebLinkAboutIntermountain Gas 2023 IPUC Form 1 - Pocatello Field Idaho PUC Pipeline Safety Inspection Summary
Inspector(s): 113rooks, Galli I Date(s): 7/24-25/2023
Company/Owner: I Intermountain Gas Company(IGC) I Unit#/OPID 18160
Inspection Type& Time (1 day, 0.5 day) Total Inspection Days:15.5
Standard: 1 5 Training: (T)(D) Integrity Management: Incident:
Follow-up: I OQ: 10.51 Damage Prevention: D&A:
Inspection Summary
Audit consisted of IPUC inspectors Brooks and Galli inspecting field installed equipment for the Pocatello,
Idaho inspection units.The PHMSA IA question set and IGC equipment listing were used as a guide
throughout the audit to ensure all areas were completed/covered.
January 9,2023: (0.5 Standard Prep)
Prepared for IGC Pocatello Field Audit
July 24 & 25, 2023: (2.0 Standard, 2.0 Travell
Met with IGC company representatives in the Pocatello district office for in-brief and to begin field audit and
review OQ records for all personnel taking part in the inspection.
Regulator Stations: 48677-RS-59867, 48821-RS-59847, 48821-RS-60099, 48821-RS-59763, 48676-RS-60103,
48676-RS-60084, 48679-RS-60078,48679-RS-59788, 48679-RS-60083, 48679-RS-59741, 48679-RS-60112,
48679-RS-60116 were inspected for proper operation,regulator lock-up, relief device operation, cathodic
protection pipe-to-soil readings,pipe-to soil interface wrap protection, station warning signs and
right-of-way clearances.
10 casing-to-carrier isolation checks, 5 cathodic protection rectifiers, 8 pipeline patrols, and 15 emergency/
isolation valves were checked for proper operation, observations listed below.
HPSS: Low CP of-0.82 mV was found on 48679-HPSS-70364 at 1299 Fore Road. This was a result of a recent
lightning strike that hit a nearby rectifier. Inspectors observed the pipe re-polarizing over the two day inspection
from-0.81 mV to -0.82 mV. IGC CP Supervisor Kelly stated they will be installing an anode near the HPSS to
prevent a reoccurrence. Two HPSS's were found with small leaks by performing a bubble test,mitigated by
proper thread engagement. Both were fixed on-site.
An exit interview was performed following the district inspection with field personnel of Intermountain Gas
Company.
July 26,2023: (0.5 Standard Post, 0.5 OQ)
Wrote inspection report, completed audit forms: PHMSA IA question set with OQ protocol 9, IPUC Form 1, Post
Inspection Preliminary Written Findings and attached inspection documents.
Attached:
IPUC Form 1, Preliminary Written Findings, Field Equipment Work Sheets
IPUC Form 1
Idaho PUC Pipeline Safety Inspection Summary
Corrective Action Required: Yes No X
Follow-up Required: by(date): Yes No X
Inspector(Lead):_
Date:
Galli L 7/26/2023
Reviewer:
_ _____ Date:_._ _ . �_�.��_____,_
Brooks 7/26/2023
IPUC Form 1