Loading...
HomeMy WebLinkAboutIntermountain Gas 231207 Rexburg LNG Observation Idaho PUC Pipeline Safety Inspection Summary Inspector(s): I Brooks, Galli I Date(s): 12/7/2023 Company/Owner: I Intermountain Gas Company(IGC) I Unit#/OPID 18160 Inspection Type&Time (1 day, 0.5 day) Total Inspection Days:13 Standard: 1 3 Training: (T)(D) Integrity Management: Incident: Follow-up: Oct: Damage Prevention: D&A: Inspection Summary December 6, 2023: (1.0 Standard)(Travel) IPUC Inspectors Brooks and Galli traveled to Rexburg to conduct observe the Rexburg LNG Vaporization Test. December 7, 2023: (1.0 Standard) IPUC inspectors observed IGC conduct their annual Rexburg LNG Vaporization Test. The IA checklist was used as a guide during the observation. IGC followed applicable documented procedures for cooldown of components, LNG transfer operations and LNG truck transfers. LNG technicians successfully transitioned to a reduced flow plan due to a malfunctioning heater burner. December 7,2023: (1.0 Standard)(Travel) IPUC Inspectors Brooks and Galli traveled back to Boise. Corrective Action Required: Yes I I Nol X Follow-up Required: by (date):; Yes No I X Inspector(Lead): Galli Date: t 12/11/2023 Reviewer:B Date: A s IPUC Form 1