Loading...
HomeMy WebLinkAboutIntermountain Gas 231002-05 Twin Falls Idaho PUC Pipeline Safety Inspection Summary Inspector(s): jPerkins Date(s)• 10/2/2023 - 10/5/2023 Company/Owner: Intermountain Gas Company Unit/OPID: 8160 Inspection Type &Time (1 day, 0.5 day) Total Inspection Days:14 Standard: Construction: Training: (T)(D)Integrity Management: 4.0 Incident: M/M: Follow-up: OQ: Damage Prevention: D&A: Inspection Summary Audit consisted of Integrity Management(IM)/High Consequence Area (HCA) confirmation verification dig in Twin Falls, Idaho. Oct 2, 2023: (1 TIMP/HCA) Inspector traveled to Twin Falls, Idaho and met with IGC personnel for an IM/HCA verification dig between Pole Line Rd and 1731 Park View Dr,Twin Falls, ID. Observed JSA, traffic control, line location and excavation. Oct 3,2023: (1 TIMP/HCA) IGC personnel continued excavation on the IM/HCA verification dig between Pole Line Rd and 1731 Park View Dr,Twin Falls, ID. Observed excavation,trench shoring, soil resistivity testing, pinpointing anomalies which ended up being pipe wrap issues from previous excavation, and coating removal. Oct 4, 2023: (1 TI M P/HCA) IGC personnel contracted Acuren to conduct wall thickness survey. IPUC inspectors witnessed NDE surface preparation, UT survey, and metalurgy testing between Pole Line Rd and 1731 Park View Dr,Twin Falls, ID: Additionally inspectors observed IGC install new anode, test post wiring, primer,rewrap of piping, bedding and backfilling. Oct 5, 2023: ( 1 Standard) Traveled back to Boise and completed reports. Attached: IPUC Form 1, Inspection Summary Locate ticket Maps of site Corrective Action Required: Yes No X Follow-up Required: b (date): Yes No X Inspector (Lead): ! r Date: B Perkins "— /�P� 10/5/2022 Reviewer: Date: J Brooks IPUC Form 1