Loading...
HomeMy WebLinkAboutIntermountain Gas 230502 Sun Valley Idaho PUC Pipeline Safety Inspection Summary Inspector(s): I Perkins, Galli I Date(s): 5/2/2023 Company/Owner: llntermountain Gas Company (IGC) I Unit#/OPID 18160 Inspection Type&Time (1 day, 0.5 day) I Total Inspection Days:12 Standard: Training: I (T)(D) Integrity Management: 1 2 1 Incident: Follow-up: OQ: Damage Prevention: D&A: Inspection Summary IPUC inspectors Perkins and Galli traveled to and from the Twin Falls district(Sun Valley region)to inspect potential flood areas along the right-a-way adjacent to the Big Wood River. Observations included: raised meter sets or sand bags when necessary. Additionally, inspectors observed a patrol at 101 W Channel Lane (48517-PP- 14155)that was found on the 2022 Twin Falls Field Audit that needs to be reworked as it's currently sitting on the concrete footings. Operations Manager Brack McMurtrey was notified about a hangar that was directly touching the pipe. Per Brack, Service Techs will be dispatched. Corrective Action Required: Yes I Nol X Follow-up Required: by (date): Yes I Nol X Inspector(lead): Date: Perkins 5/2/2023 Reviewer: Ll � Date:Brooks IPUC Form 1