Loading...
HomeMy WebLinkAboutIntermountain Gas 230327 IPUC Form 1 - IGC Records Idaho PUC Pipeline Safety Inspection Summary Inspector(s): jPerkins, Galli I Date(s): 3/27&28/2023 Company/Owner: Intermountain Gas Company(IGC) junit#/OPID 18160 Inspection Type&Time (1 day, 0.5 day) Total Inspection Days: 5.5 Standard: 5.5 Construction: Training: (T)(D)Integrity Management: Incident: Gas Rule: = Follow-up: Oct: Damage Prevention: D&A: Inspection Summary 2022 Records Audit of Intermountain Gas Company March 23, 2023: (1.0 Standard Prep) Intermountain Gas Companies (IGC) 0&M Manual and records requirements were reviewed and compared to the PHMSA Inspector Assistant (IA) question set. March 27-28, 2023: (4.0 Standard) Bruce Perkins and Matt Galli of the Idaho Public Utilities Commission (IPUC) met with IGC compliance personnel Wendy McDonough, Darren Tinnerstet and Colby Lundstrom virtually to review records for the previous year of 2022. The PHMSA IA question set for the records portion was used as a guide throughout the audit to ensure all areas were completed as they pertain to required records. A complete list of attendees can be found in the IA inspection. March 29,2023: (0.5 Standard/Post) Typed the inspection report, completed audit forms IPUC Forms 1 and attached inspection documents. Completed the Post-Inspection Written Preliminary Findings and sent to Colby Lundstrom - Manager, Compliance and Operations Programs. Observations:See attached Post-Visit Verbal Briefing Attached: IPUC Form 1, Inspection Summary Post-Inspection Written Preliminary Findings Supporting Inspection Documents Corrective Action Required: 1202302 NOPV Yes X No Follow-up Required: by (date): 5/25/202 Yes X No Inspector (Lead): / -, ,� j i Date: Perkins 4/10/2023 Reviewer: Brooks Date: 4/10/2023 IPUC Form 1