HomeMy WebLinkAboutIntermountain Gas 230315 Paradigm Training Idaho PUC Pipeline Safety Inspection Summary
Inspector(s): jPerkins, Galli I Date(s): 3/15/2023
Company/Owner: I Paradigm Liaison Services I Unit#/OPID
Inspection Type&Time (1 day, 0.5 day) Total Inspection Days: 1
Standard: Construction. Training: (T)(D)Integrity Management: Incident
Gas Rule:. Follow-up: OQ: Damage Prevention 1� D&A.
Inspection Summary
IPUC inspectors Perkins and Galli travelled to Mountain Home, ID to attend Paradigm Liaison Services -2023
ID Pipeline Safety Program. Program included an overview of Pipeline Safety,NENA Pipeline Emergency
Operation, Emergency Response(Signs of a leak,What to do if a leak occurs, Pipeline Emergency Senario),
Damage Prevention Programs, Pipeline Identification, Gas and Hazardous Liquid characteristics and Excavation
Best Practices.
Attachments:
List of Attendees
Program Guide
Quick Reference Guide
Awareness Survey
Corrective Action Required: Yes I Nol X
Follow-up Required: by (date): Yes No X
Inspector (Lead_):
Date:
Perkins 3/15/2023
Reviewer:
Date:
Brooks
IPUC Form 1