Loading...
HomeMy WebLinkAboutIntermountain Gas 230315 Paradigm Training Idaho PUC Pipeline Safety Inspection Summary Inspector(s): jPerkins, Galli I Date(s): 3/15/2023 Company/Owner: I Paradigm Liaison Services I Unit#/OPID Inspection Type&Time (1 day, 0.5 day) Total Inspection Days: 1 Standard: Construction. Training: (T)(D)Integrity Management: Incident Gas Rule:. Follow-up: OQ: Damage Prevention 1� D&A. Inspection Summary IPUC inspectors Perkins and Galli travelled to Mountain Home, ID to attend Paradigm Liaison Services -2023 ID Pipeline Safety Program. Program included an overview of Pipeline Safety,NENA Pipeline Emergency Operation, Emergency Response(Signs of a leak,What to do if a leak occurs, Pipeline Emergency Senario), Damage Prevention Programs, Pipeline Identification, Gas and Hazardous Liquid characteristics and Excavation Best Practices. Attachments: List of Attendees Program Guide Quick Reference Guide Awareness Survey Corrective Action Required: Yes I Nol X Follow-up Required: by (date): Yes No X Inspector (Lead_): Date: Perkins 3/15/2023 Reviewer: Date: Brooks IPUC Form 1